Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20161019
    Veröffentlichungsdatum: 19 April 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    STROMNETZ HAMBURG GMBH

    Ort

    Beschreibung

    Modernisation of the city of Hamburg's municipal electricity distribution network in the years 2017-2021.

    Ziele

    The project comprises a multi-annual investment programme in the electricity distribution network of the city of Hamburg. The project includes the refurbishment and restructuring of ageing high, medium and low voltage network infrastructure, connecting infrastructure for embedded renewable energy sources (RES), small-scale combined heat and power systems (CHPs), an electric city bus network and smart grid infrastructure (remote control functionality, smart meters).

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 220 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 485 million

    Umweltaspekte

    The project includes facilities that fall under Annex II of the EIA Directive (2011/92/EU), which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected for some schemes relate to visual impact, impact on flying vertebrates, electromagnetic fields, noise nuisance and disturbances during construction. The appraisal will focus on the promoter's environmental capacity and work procedures.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directives 89/665/EEC and/or 92/13/EEC as amended by Directive 2007/66/EC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    Unterzeichnet - 30/09/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Deutschland Energie