corporate_banner_en

S8 EXPRESSWAY WARSAW APPROACHES

Projects
Regions
European Union
Enlargement countries
European Free Trade Association
Mediterranean neighbourhood
FEMIP overview
Maximizing synergies
Financing & advisory services
Loans
Private equity
Advisory services
FEMIP Support Package
How to apply
Trust fund
Technical advisory
Private equity
CAMENA Climate action envelope
MED 5P
Organisation and staff
FAQ - FEMIP
EU Eastern neighbours
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Examples of EPTATF Operations
Institutional framework
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Sub-Saharan Africa, Caribbean and Pacific
Funding and financial instruments
Applying for loans
Cooperation with partners
Investment Facility
Other initiatives
Activities
Asia and Latin America
Priorities
Climate
EIB and COP
Economic and Social Cohesion
Infrastructure
Innovation and skills
Investing for Youth
SMEs
Environment
Sectors
Agriculture, Food and Rural Development
Digital economy
Education and training
Energy
Forestry
Health and Life Science
Regional development
Trans-European Networks
Urban agenda
Water and Wastewater management
Project cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Recently approved projects
Projects financed
Breakdown by region
European Union
EFTA countries
Enlargement countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Multi-criteria list
Operations evaluation
Process and methodology

S8 EXPRESSWAY WARSAW APPROACHES

  •  Reference: 20120642
  •  Release date: 12 February 2014
Promoter – Financial Intermediary

MINISTRY OF TRANSPORT

Location
Description

The project concerns the construction of two sections of 2 x 2 expressway adjacent to the Warsaw ringroad in central Poland (37km in all)

Objectives

The project concerns the construction of two sections of 2 x 2 expressway adjacent to the Warsaw ring road in central Poland: (i) about 22km between Radziejowice and Paskow to the south west of Warsaw (in two sub-sections) and (ii) about 15km around Marki to the north east of Warsaw (in two sub-sections). These form part of the broader S8 expressway route in Poland from Wroclaw in the south-west of the country to the border with Lithuania at Budzisk in the north-east and will facilitate the passage of long distance traffic around the city of Warsaw. The project complements the existing EIB operation Warsaw Ring Road 2.

Comments
 
Sector(s)
Proposed EIB finance (Approximate amount)

PLN 600 million (EUR 146 million)

Total cost (Approximate amount)

PLN 1500 million (EUR 365 million)

Environmental aspects

The project involves the construction of new expressways in a rural and suburban environment. The various sections all fall under Annex I of EIA Directive 2011/92/EU requiring a full EIA procedure. The project sections are all located in the Masovian Region and have been subject to three, separate procedures. The project is situated in the vicinity of the following Natura 2000 areas: Dabrowa Radziejowska (PLH140003), Poligon Rembertow (PLH140034) and Biale Blota (PLH140038). Therefore, the provisions of the Habitats Directive (92/43/EEC) apply. The investments are included in the National Road Construction Program and the current Operational Program Infrastructure and Environment, both of which were subject to a form of strategic environmental assessment. The project likely involves the expropriation of private and public land as well as the involuntary resettlement of residential homes. The procedures and outcomes of the environmental and social assessment are to be further reviewed during appraisal.

Procurement

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and/or 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]),), with publication of tender notices in the EU Official Journal, as and where required.

Status

Signed   -   15/10/2014.


Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).



 Print
Copyright © European Investment Bank 2016
The European Investment Bank is not responsible for the content of external internet sites.