Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20180398
    Release date: 30 August 2018

    Promoter – Financial Intermediary

    OISE HABITAT-OFFICE PUBLIC DE L'HABITAT DES COMMUNES DE L'OISE,REIMS HABITAT CHAMPAGNE-ARDENNE OFFICE PUBLIC DE L'HABITAT,OFFICE PUBLIC DE L'HABITAT DE L'AISNE,OFFICE PUBLIC DE L'HABITAT D'AMIENS METROPOLE,OFFICE PUBLIC DE L'HABITAT DE LAON

    Location

    Description

    The project consists of the construction of more than 1200 new social and affordable housing units as well as the rehabilitation of about 4300 existing units carried by four social housing operators that have joined to create the Réseau Canopée in France.

    Objectives

    The new constructions will increase and diversify the supply available in view of matching the demand of the evolving profile of tenants. The rehabilitation project comprises energy efficiency works aiming at reducing CO2 emissions of an aging stock and fighting energy poverty.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 107 million

    Total cost (Approximate amount)

    EUR 326 million

    Environmental aspects

    The construction of new housing units will target an energy efficiency performance compatible with the near zero energy buildings (NZEB) level objectives in France (RT2012). The new NZEB buildings will be constructed as per the requirements of the EU Energy Performance of Buildings Directive (EPBD) 2010/31/EU [Article 9(1)]. The rehabilitation of existing units will consist mainly in a deep energy efficiency rehabilitation works, as the social housing stock available in the area covered by the Canopee platform, ranks amongst the oldest of France (42 years old in average) and has a higher rate of energy inefficiency. The aim of this operation is to generate environmental benefits and help reduce the risks associated with the climate change. The sub-projects to be financed are likely to be small and should have a very limited negative impact on the environment, especially as they will have to meet the Bank's urban plan (i.e. fight against urban sprawl, density, diversity, etc.). The cumulative impact of the sub-projects could instead generate significant environmental benefits.

    Procurement

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directives2014/24/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Status

    Signed - 19/12/2018

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    France Urban development