    Reference: 20170057
    Release date: 14 November 2017

    Promoter – Financial Intermediary

    KONINKRIJK DER NEDERLANDEN

    Location

    Description

    The project consists of the reinforcement of the Afsluitdijk dyke body and the sluices and locks at Den Oever and Kornwerderzand so as to withstand a storm with a probability of 1/10 000 years, until at least halfway through this century. Pumps will be installed within the sluice complex at Den Oever to ensure the availability of drainage capacity even at times when sluicing is not possible. The project includes a small component of road improvement and maintenance to the National Motorway A7. The project is situated at the northern part of the Netherlands, running from Den Oever on Wieringen in North Holland province and providing flood protection from the Wadden Sea.

    Objectives

    The project aims to protect the Netherlands against rising sea and inland water levels. The project concerns the upgrade of the 32km long Afsluitdijk dyke, which currently does not meet the requirements for safety against flooding. The project is being procured as a design-build-finance-maintain (DBFM) public-private partnership (PPP).

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 326 million

    Total cost (Approximate amount)

    EUR 788 million

    Environmental aspects

    The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU. Compliance with the EIA Directive, the Habitats Directive (92/43/EEC) and Birds Directives (79/409/EEC) and NATURA 2000 will be verified in detail during appraisal.

    Procurement

    The tender process was launched in November 2016, four letters of interest were received and in February 2017 a competitive dialogue process started with the bidders. Final offers and contract award together with financial close are expected to happen during 2018. The concession will include design, construction, financing and maintenance. Procurement procedures and compliance with Directive 2004/18/EC will be verified in detail during appraisal.

    Status

    Signed - 29/05/2018

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    The Netherlands Transport Water, sewerage