Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20120418
    Release date: 5 January 2015

    Promoter – Financial Intermediary

    JP DIREKCIJA CESTA FEDERACIJE BOSNE I HERCEGOVINE

    Location

    Description

    Rehabilitation and safety improvements of part of the national road network in the Federation of Bosnia and Herzegovina (FBiH).

    Objectives

    The project is expected to facilitate trade, develop tourism, support private sector development, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region.

    Comments

    The investment schemes composing the project are expected to be carried out over a five-year period from 2014 until 2019.
    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 50 million

    Total cost (Approximate amount)

    EUR 103 million

    Environmental aspects

    If located in the EU, two of the investments would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and therefore be subject to screening. In FBiH they fall under the EIA procedure stipulated by the Law on Environmental Protection of BiH. The promoter has already carried out the EIA studies for these schemes. Their content and compliance with the principles of the relevant EU directives on strategic environmental assessment (SEA), EIA and nature conservation will be verified during appraisal. All other investments fall outside of the scope of Annexes I and II of the EIA Directive; the compliance of this second group of investments with the principles of the relevant EU directives on SEA, EIA and nature conservation will also be verified during appraisal.

    Procurement

    The Bank will require the promoter to ensure that any procurement procedures related to the project are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Status

    Signed - 23/02/2016

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Bosnia and Herzegovina Transport