corporate_banner_en

NEPAL TANAHU HYDROPOWER PROJECT

Projects
Regions
European Union
Enlargement countries
Turkey
Iceland
Western Balkans
European Free Trade Association
Mediterranean Neighbourhood
FEMIP Overview
Supporting pan-Mediterranean initiatives
Financing & advice
FEMIP Loans
Private equity
Advisory & technical assistance
FEMIP Support Package
Procurement
How to apply
Trust Fund
Technical assistance
Private equity
Global dialogue
Partnerships
Organisation and staff
FEMIP Internship Programme
FAQ - FEMIP
EU Eastern Neighbours
Projects
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Institutional framework
Applying for loans
Organisation and staff
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Applying for loans
Organisation and staff
Sub-Saharan Africa, Caribbean and Pacific
Funding and Financial Instruments
Applying for loans
Cooperation with partners
Investment Facility
Other initiatives
Activities
Asia and Latin America
Priorities
SMEs
Innovative options
Loans
Microfinance
EU partners for SMEs & mid-caps
Non-EU partners for SMEs & mid-caps
RDI support
Equity investment
Regional development
Climate Action
Urban & natural environment
Innovation
Skills and Jobs
Trans-European Networks
Transport
Energy
Project Cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be Financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin & Central America
Breakdown by sector
Projects Financed
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Multi-criteria list
Operations Evaluation
Organisation and Programme
Programme
Methodology
Criteria
Rating scale
Process
Reports
Operations
Overview
Publications and reports
Cooperation and Coordination
ECG
European Financial Institutions
European Commission
Contacts

NEPAL TANAHU HYDROPOWER PROJECT

  •  Reference: 20120278
  •  Release date: 09 October 2012
Promoter – Financial Intermediary

TANAHU HYDROPOWER LTD

Location
Description

The project comprises the construction and operation of a 140 MW storage hydroelectric power scheme and its interconnection to the national grid. It is designed to help meet peak electricity demand in Nepal during the dry winter months and to operate as a baseload plant for the remainder of the year. The project will provide an alternative to expensive fossil fuel based power generation through cleaner energy, and will help stabilise Nepal's power supply system and reduce transmission losses.

Objectives

The project will provide this low income country with sustainable renewable electrical energy and will help to avoid additional thermal (diesel-fired) generation that is associated with high emissions of CO2 and other harmful atmospheric pollutants. The project will supply this renewable energy to a network that has a severe generation deficit which has resulted in extensive load shedding and related damage to the local economy. The project is therefore in line with the External Lending Mandate by promoting economic development and environmentally sustainable energy production. Financing of this project would contribute to the Bank's energy lending objectives related to renewable energy and the mitigation of climate change.

Comments

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Sector(s)
Proposed EIB finance (Approximate amount)

EUR 55 million

Total cost (Approximate amount)

EUR 390 million

Environmental aspects

An ESIA has been completed, in line with the principles of EU legislation, and has been approved by the competent environmental authority. The project will require the resettlement of 86 households and the acquisition of 112 ha of private land, of which only a minor proportion is currently cultivated. Appropriate compensation will be provided to all people affected by the project in accordance with national legislation and lenders' requirements. No significant negative environmental or social impacts have been identified that would prevent development of the project.

Procurement

The Bank will require the promoter to ensure that implementation of the project will be conducted in accordance with the Bank's Guide to Procurement.

Status

Signed   -   07/05/2013.

Related Documents
  • 18-10-2012 - Initial Environment Examination Tanahu (Upper Seti) Hydropower Project: Upper Seti (Damauli)-Bharatpur 220 kV Transmission Line Project Environmental Assessment and Measures Jun 2010 EN
  • 18-10-2012 - Environmental Impact Assessments Tanahu (Upper Seti) Hydropower Project Environmental Assessment and Measures Aug 2009 (Final Report) EN
  • 18-10-2012 - Environmental assessment report rural electrification Tanahun IEE EN
  • 22-10-2012 - Initial Environment Examination Upper Seti (Damauli)-Bharatpur 220 kV Transmission Line Project Environmental Assessment and Measures Jun 2010 - Vol. II - Appendices EN

Related Documents (in the Public Register)

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).



 Print
Copyright © European Investment Bank 2014
The European Investment Bank is not responsible for the content of external internet sites.

http://www.eib.org/projects/pipeline/2012/20120278.htm