corporate_banner_en

NEPAL TANAHU HYDROPOWER PROJECT

Projects
Regions
European Union
Enlargement Countries
Definitions
Croatia
Turkey
Iceland
The Western Balkans
FYROM
Montenegro
Mediterranean neighbourhood
FEMIP Overview
Supporting pan-Mediterranean initiatives
Financing & advice
FEMIP Loans
Private equity
Advisory & technical assistance
FEMIP Support Package
Procurement
How to apply
Trust Fund
Technical assistance
Private equity
Global dialogue
Meetings: A place for dialogue
Conferences
Partnerships
Organisation and staff
FEMIP Internship Programme
FAQ - FEMIP
EU Eastern Neighbours
Projects
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Institutional framework
Applying for loans
Organisation and staff
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Applying for loans
Organisation and staff
Sub-Saharan Africa, Caribbean and Pacific
ACPs and OCTs
Applying for a loan
Products and Services
Subsidies
Technical assistance
Strategic Focus
The Republic of South Africa
Applying for a loan
Financial Instruments
Strategic Focus
Organisation and Staff
Regional Offices
Caribbean
Central and Eastern Africa
Pacific
Southern Africa and Indian Ocean
West Africa and Sahel
Other initiatives
Asia and Latin America (ALA)
Priorities
SMEs
Other Credit Lines
Working capital
Innovative financing options
Loans for SMEs
SME support outside the EU
Capital injection and development advice
Regional development
Promoting environmental Sustainability
Urban Environment
Sustainable transport
Water Supply and Sanitation
Climate Action
Carbon finance
Renewable Energies and Energy Efficiency
Biodiversity
Responsibility and Sustainability
Access to Environmental Information
Information directly available
Information available on request
Applications for information
Other useful sources of information
Organisation
EPE
Declaration
Supporting Material
The Environmental Acquis
Objectives and Principles
Treaties
Signatory Banks
NIB
NEFCO
EIB
CEB
EBRD
Innovation
Education
Research and Development
Inventing the future
Trans-European Networks (TENs)
Added Value
European Action for Growth and the TENs Investment Facility
Financing of TEN Projects
Energy
External Security
Diversification and Security
Human Capital
Health
Education
Project Cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be Financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin & Central America
Breakdown by sector
Projects Financed
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin & Central America
Breakdown by sector
Multi-criteria list
Operations Evaluation
Organisation and Programme
Programme
Methodology
Criteria
Rating scale
Process
Reports
Operations
Overview
Publications and reports
Cooperation and Coordination
ECG
European Financial Institutions
European Commission
Contacts

NEPAL TANAHU HYDROPOWER PROJECT

  •  Reference: 20120278
  •  Release date: 09 October 2012
Promoter – Financial Intermediary

TANAHU HYDROPOWER LTD

Location
  • Nepal
Description

The project comprises the construction and operation of a 140 MW storage hydroelectric power scheme and its interconnection to the national grid. It is designed to help meet peak electricity demand in Nepal during the dry winter months and to operate as a baseload plant during the remainder of the year. The project will provide an alternative to expensive fossil-fuel based power generation with cleaner energy, help stabilise Nepal's power supply system and reduce transmission losses.

Objectives

The project will provide this low income country with sustainable renewable electrical energy and will help to avoid additional thermal (diesel-fired) generation that is associated with high emissions of CO2 and other harmful atmospheric pollutants. The project will supply this renewable energy to a network that has a severe generation deficit which has resulted in extensive load shedding and related damage to the local economy. The project is therefore in line with the External Lending Mandate by promoting economic development and environmentally sustainable energy production. Financing of this project would contribute to the Bank’s energy lending objectives related to renewable energy and the mitigation of climate change.

Comments

Covered by the EU guarantee. Covered by the EU guarantee.

Sector(s)
  • Energy
Proposed EIB finance (Approximate amount)

EUR 55 million

Total cost (Approximate amount)

EUR 390 million

Environmental aspects

An ESIA has been completed, in line with the principles of EU legislation, and has been approved by the competent environmental authority. The project will require the resettlement of 86 households and the acquisition of 112 ha of private land, of which only a minor proportion is currently cultivated. Appropriate compensation will be provided to all people affected by the project in accordance with national legislation and lenders' requirements. No significant negative environmental or social impacts have been identified that would prevent development of the project.

Procurement

The Bank will require the promoter to ensure that implementation of the project will be conducted in accordance with the Bank’s Guide to Procurement.

Status

Approved   -   14/03/2013.

Related Documents
  • 18-10-2012 - Initial Environment Examination Tanahu (Upper Seti) Hydropower Project: Upper Seti (Damauli)-Bharatpur 220 kV Transmission Line Project Environmental Assessment and Measures Jun 2010 EN
  • 18-10-2012 - Environmental Impact Assessments Tanahu (Upper Seti) Hydropower Project Environmental Assessment and Measures Aug 2009 (Final Report) EN
  • 18-10-2012 - Environmental assessment report rural electrification Tanahun IEE EN
  • 22-10-2012 - Initial Environment Examination Upper Seti (Damauli)-Bharatpur 220 kV Transmission Line Project Environmental Assessment and Measures Jun 2010 - Vol. II - Appendices EN

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. Therefore data provided on this page is indicative and cannot be considered to represent official EIB Policy (see also the Explanatory notes).


 Print
Copyright © European Investment Bank 2013
The European Investment Bank is not responsible for the content of external internet sites.

http://www.eib.org/projects/pipeline/2012/20120278.htm