corporate_banner_en

Enel Green Power Romania

Projects
Regions
European Union
Enlargement countries
European Free Trade Association
Mediterranean neighbourhood
FEMIP overview
Maximizing synergies
Financing & advisory services
Loans
Private equity
Advisory services
FEMIP Support Package
How to apply
Trust fund
Technical advisory
Private equity
CAMENA Climate action envelope
MED 5P
Organisation and staff
FAQ - FEMIP
EU Eastern neighbours
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Examples of EPTATF Operations
Institutional framework
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Sub-Saharan Africa, Caribbean and Pacific
Funding and financial instruments
Applying for loans
Cooperation with partners
Investment Facility
Other initiatives
Activities
Asia and Latin America
Priorities
Climate
EIB and COP
Economic and Social Cohesion
Infrastructure
Innovation and skills
Investing for Youth
SMEs
Environment
Sectors
Agriculture, Food and Rural Development
Aviation
Digital economy
Education and training
Energy
Forestry
Health and Life Science
Maritime
Regional development
Roads
Trans-European Networks
Transport
Urban agenda
Water and Wastewater management
Project cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Recently approved projects
Projects financed
Breakdown by region
European Union
EFTA countries
Enlargement countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Multi-criteria list
Operations evaluation
Process and methodology

Enel Green Power Romania

  •  Reference: 20110247
  •  Release date: 28 July 2011
Promoter – Financial Intermediary

Enel Green Power S.p.A.

Location
Description

Financing of the investment programme of Enel Green Power Romania for the development, construction and operation of three on-shore wind farms located in the regions of Dobrogea (Salbatica and Corugea) and Banat (Moldova Noua) for a total installed capacity of some 260 MW.

Objectives

The project concerns the development, construction and operation of three Romanian wind farms with a total capacity of 258 MW: Salbatica 1 (70 MW), Salbatica 2 (70 MW), Moldova Noua (48MW) and Corugea (70MW). The projects will be equipped with 126 turbines with a unit capacity ranging from 2.0 to 2.3 MW and hub height between 95 and 101m. Furthermore each project will include the electrical grid to connect the different wind turbines, the civil works for foundations and infrastructure (e.g. access roads) as well as the substation and HV cable for the connection to the network.

Comments
 
Sector(s)
Proposed EIB finance (Approximate amount)

EUR 200 million

Total cost (Approximate amount)

EUR 400 million

Environmental aspects

The projects fall under Annex II of the EIA Directive 85/337/EC (as amended) and have been screened in by the national competent authorities which have required a full EIA including public consultation. According to the information available all project sites, located in the Dobrogea and Banat regions, may either be inside or close to Natura 2000 sites.  During the appraisal the Bank will check whether the EIAs have been carried out in compliance with the EU Directives and in particular whether the competent environmental authority has performed an appropriate assessment of the impacts (including cumulative ones) of the wind farms on the affected protected natural sites as envisaged under the EU Habitats Directive.

Procurement

Since the promoter is a public undertaking it will follow the EU Procurement Directive 2004/17/EC to procure the equipment and construction works according to the public procurement principles established in the EIB guide to procurement.

Status

Signed   -   28/11/2013.

Related Documents
  • 21-09-2011 - Biodiversity Monitoring Report - Corugea Project RO
  • 13-09-2011 - Biodiversity Monitoring Report - Salbatica project RO
  • 13-09-2011 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) - Enel Green Power Romania - Corugea project EN
  • 13-09-2011 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) - Enel Green Power Romania - Salbatica project EN
  • 13-09-2011 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) - Enel Green Power Romania - Moldova Noua EN
  • 13-09-2011 - Environmental Impact Assessment (EIA) - Corugea project RO
  • 13-09-2011 - Environmental Impact Assessment (EIA) - Moldova Noua project RO
  • 13-09-2011 - Environmental Impact Assessment (EIA) - Salbatica project RO

Related Documents (in the Public Register)

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).



 Print
Copyright © European Investment Bank 2016
The European Investment Bank is not responsible for the content of external internet sites.