    Référence: 20150820
    Date de publication: 26 octobre 2016

    Promoteur – Intermédiaire Financier

    Privately owned electricity distribution network operator

    Lieu

    Description

    Investment schemes in the electricity distribution network covering various parts of Sweden, planned for implementation in the years 2017-2019

    Objectifs

    The investments focus mainly on increasing the capacity and renewing the network in one of the larger cities, continuing to weather-proof the rural network and preparing the network to receive more distributed renewable energy.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Not disclosed.

    Coût total (montant approximatif)

    Not disclosed.

    Aspects environnementaux

    The project includes some facilities that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), which requires the competent national authority to determine the need for an EIA. The impact that can typically be expected for some schemes relates to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction. However, medium voltage (MV) and low voltage (LV) schemes are normally expected to have minimal or no environmental impact. The appraisal will focus on the promoter's environmental management capacity and work procedures.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with the relevant applicable EU procurement legislation (i.e. Directives 2014/23/EU, 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 7/02/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Suède Énergie