    Référence: 20140532
    Date de publication: 30 octobre 2014

    Promoteur – Intermédiaire Financier

    PUBLIC ENTITY(IES)

    Lieu

    Description

    Framework loan to support priority investments in the recovery of areas affected by the conflict in the Ukrainian region of Donbas and in basic infrastructure catering to needs of displaced people.

    Objectifs

    The objective of the early recovery phase is to address (i) short-term needs in the affected areas under the control of the Government of Ukraine and (ii) basic infrastructure needs to shelter internally displaced people in other regions of Ukraine.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 200 million

    Aspects environnementaux

    The large majority of the investments foreseen by the project are repairs and refurbishment of damaged infrastructure. Therefore potential negative environmental impacts are likely to be minor. If situated in the EU, these schemes would likely fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and therefore be subject to screening. Some of the schemes nevertheless might require an EIA. Appropriate screening procedures, also in relation to natural habitats and protected species, as well as land acquisition/resettlement will be put in place.
    Given the complex situation, the relevant analysis of social risks and impacts of the project will also be duly carried out as part of the appraisal, in accordance with the EIB Social Standards.

    Passation des marchés

    The promoter is a public entity. The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 22/12/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Ukraine Infrastructure composite Énergie Eau, assainissement Aménagement urbain Industrie