Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130417
    Date de publication: 17 septembre 2013

    Promoteur – Intermédiaire Financier

    PARDUBICKY KRAJ

    Lieu

    Description

    A multi-sector framework facility for financing investment schemes within the Regional Investment Programme.

    Objectifs

    The proposed Framework Loan will be the third operation with the Promoter (Pardubice Region) for financing of priority regional investments. Both previous operations have been fully disbursed and allocated.

    Majority of the schemes are expected to be complemented by EU grant support in the 2007-2013 programming period. The loan will thus both facilitate and accelerate the implementation of EU supported investments.

    Commentaires

    -

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    CZK 600 million (EUR 23 million)

    Coût total (montant approximatif)

    CZK 1200 million (EUR 46 million)

    Aspects environnementaux

    The project comprises a multi-scheme operation classified as a Framework Loan and some of the schemes may eventually fall under Annex II of the EIA 2011/92/EU Directive. Should any such scheme have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC), the Bank would require the promoter to act according to the provisions of the aforementioned Directives as transposed into the national law. It is a requirement that all schemes must be implemented in compliance with the EU environmental legislation.

    Passation des marchés

    The promoter, the Pardubice Region, will be required to follow the EU public procurement rules (2004/18/EC), including the publication of contract notices in the EU Official Journal as implemented by national law, if and where appropriate. Projects with values below the EU thresholds will be procured according to the provisions laid down in national legislation.

    Statut

    Signé - 19/12/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    République tchèque Infrastructure composite Transports