Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120684
    Date de publication: 26 juin 2013

    Promoteur – Intermédiaire Financier

    ACCEPTABLE BANK(S)

    Lieu

    Description

    The FEMIP Sustainable Energy facility aims at providing credit lines to local participating financial institutions in Jordan and Morocco to finance energy efficiency and small renewable energy investments in the industrial, SMEs, agribusiness, commercial services and residential sectors. This project will contribute to the reduction of greenhouse gas emissions and the enhancement of security of supply.

    Objectifs

    Improving access to term finance at favourable conditions.

    Commentaires

    This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Montant BEI envisagé (montant approximatif)

    EUR 35 million

    Coût total (montant approximatif)

    Not applicable.

    Aspects environnementaux

    The operation will focus on small-size projects with, in principle, limited environmental impacts. Depending on their technical characteristics the investments may be categorised as projects falling under Annex II of the EU Enviromental Impact Assessment (EIA) Directive, leaving it to local legislation or the competent authority to determine whether or not an EIA is required. It cannot be excluded at this stage that some of the schemes may require an EIA. In all cases where a formal EIA is required, a copy of the Environmental Impact Statement will be provided to the Bank, and published on its website (or that of another involved European financial institution) at the time of allocation. Public consultation will be conducted as required. These will be verified by the financial institution and reviewed by the Bank. The borrower will be required to verify that none of the schemes submitted for part-financing by the Bank have a significant negative impact on any site of nature conservation importance.

    Passation des marchés

    The facility is targeting SMEs and larger companies in the private sector; it is thus not expected to be subject to public procurement requirements. There could be cases (for example with renewable energy investments) where the sub-project could be enjoying special and exclusive rights in line with the procurement Directives, and in that case the technical consultants to the participating financial institutions will assess the need to follow public or private procurement principles. In any case, the Bank will require of the promoter and the financial institutions to ensure that the implementation of the projects will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 17/03/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Maroc Lignes de crédit