Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120619
    Date de publication: 21 novembre 2013

    Promoteur – Intermédiaire Financier

    FREIE UND HANSESTADT HAMBURG
    GMH GEBAEUDEMANAGEMENT HAMBURG GMBH

    Lieu

    Description

    Extension and refurbishment of the university campus in Hamburg to merge several academic institutes into a common facility to boost research on climate change.

    Objectifs

    The actual project is the first phase of the complete restructuring of the campus and will be delivered in three subprojects:
    •The new construction of an Institute for Climate and Geological Science to provide space for a Cluster of Excellence “Integrated Climate System Analysis and Prediction (CliSAP).
    •The new construction of an interdisciplinary building providing space for lecture halls, the library with workplaces for students, a canteen and cafeteria, and support services such as the IT Department, etc.
    •The rehabilitation of the existing building for Geological Sciences to provide space for the Institute of Arithmetic and a high performance Computing and Data Centre.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 140 million

    Coût total (montant approximatif)

    Not disclosed.

    Aspects environnementaux

    University buildings are not specifically mentioned in the EIA Directive 2011/92/EU, though the project may be covered by Annex II of the Directive in relation to urban development. The Bank’s services will verify during appraisal whether an EIA is required and the related decision of the competent authority.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/17/EC/ or 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 22/12/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Éducation