Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20120619
Date de publication: 21 novembre 2013

Promoteur – Intermédiaire Financier

FREIE UND HANSESTADT HAMBURG
GMH GEBAEUDEMANAGEMENT HAMBURG GMBH

Lieu

Description

Extension and refurbishment of the university campus in Hamburg to merge several academic institutes into a common facility to boost research on climate change.

Objectifs

The actual project is the first phase of the complete restructuring of the campus and will be delivered in three subprojects:
•The new construction of an Institute for Climate and Geological Science to provide space for a Cluster of Excellence “Integrated Climate System Analysis and Prediction (CliSAP).
•The new construction of an interdisciplinary building providing space for lecture halls, the library with workplaces for students, a canteen and cafeteria, and support services such as the IT Department, etc.
•The rehabilitation of the existing building for Geological Sciences to provide space for the Institute of Arithmetic and a high performance Computing and Data Centre.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 140 million

Coût total (montant approximatif)

Not disclosed.

Aspects environnementaux

University buildings are not specifically mentioned in the EIA Directive 2011/92/EU, though the project may be covered by Annex II of the Directive in relation to urban development. The Bank’s services will verify during appraisal whether an EIA is required and the related decision of the competent authority.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/17/EC/ or 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Statut

Signé - 22/12/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Éducation