    Référence: 20120602
    Date de publication: 18 septembre 2013

    Promoteur – Intermédiaire Financier

    ZESCO Ltd

    Lieu

    Description

    The transmission component consists of the construction/upgrading of 100 km transmission lines on 132 kV voltage and of seven 132-330 kV transmission substations. The distribution component comprises the upgrading of the 11-33 kV distribution system with nine 11-33 kV distribution substations and some 200 km of distribution lines and underground cables.

    Objectifs

    The purpose of the project is to reinforce and upgrade the power transmission and distribution infrastructure in the Lusaka area. The proposed investment programme will help remove bottlenecks from the current aged power network, thus reducing equipment failure and electricity losses. The project will increase the reliability and quality of domestic power transmission and distribution service in the Lusaka area.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 78 million

    Coût total (montant approximatif)

    EUR 189 million

    Aspects environnementaux

    132 kV transmission lines of this program would fall under definition of EIA directive 2011/92/EU Annex 2 (if situated within EU), and would require the competent Environmental Agency to screen and decide the necessity of ESIAs. The promoter has prepared the ESIA for these 132 kV works. Other works of the project (11 and 33 kV distribution) are not expected to require ESIAs.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank’s Guide to Procurement.
    The procurement packages are envisaged to be defined considering parallel co-financing with World Bank.

    Statut

    Signé - 16/01/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Zambie Énergie