Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200460
    Date de publication: 1 septembre 2021

    Promoteur – Intermédiaire Financier

    DALKOMSOMALIA LLC

    Lieu

    Description

    The project entails the connection of Somalia to the largest submarine cable system in Africa, which will significantly enhance the resilience, quality and capacity of the country's international connectivity. The project also includes the deployment of the first segment of a new national fibre optic backbone to interconnect the capital city with regional hubs, enabling them to access the country's new high quality connection to the internet.

    Objectifs

    The project seeks to significantly improve Somalia's digital infrastructure by diversifying the country's international connectivity and enabling the expansion of broadband networks into previously underserved areas. The investments supported by the EIB financing will lead to an accelerated market uptake of broadband services, driven by an increased affordability among the population. The project entails various socio-economic benefits derived from Somalia's digital transformation, COVID-19 pandemic recovery and enhanced cross-sectoral economic resilience.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    USD 14 million (EUR 13 million)

    Coût total (montant approximatif)

    USD 29 million (EUR 26 million)

    Aspects environnementaux

    If it were located within the EU, the project would not require a mandatory environmental impact assessment (EIA), as it does not fall under Annex I or II of the EIA Directive 2014/52/EU amending the Directive 2011/92/EU. Typically, the rollout of telecommunication networks have limited environmental and social negative effects, apart from short duration disturbances during network deployment, whenever civil works are required, which can be mitigated by appropriate measures. Full environmental and social details will be assessed during appraisal, with particular focus on the submarine cable and fibre optics backbone, which are the project components that will require relevant construction works, and environmental and social studies may be required by the Bank.

    Passation des marchés

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    À l'examen - 14/10/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Somalie Télécom