Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190316
    Date de publication: 17 septembre 2020

    Promoteur – Intermédiaire Financier

    MINISTRY OF CONSTRUCTION AND URBAN DEVELOPMENT - MONGOLIA

    Lieu

    Description

    The proposed investment programme aims to support the government in establishing green, resilient, inclusive, and competitive urban centres in selected aimags (provinces) of Mongolia. The program, jointly financed with the Asian Development Bank, will comprise a sequenced set of investments to promote inclusive rural-urban transformation, including the most urgent and critically needed infrastructure.

    Objectifs

    The investment program is a part of a larger ASDIP Programme (Aimag and Soum Centers Green and Resilient Regional Development Investment Program). The ASDIP assumes financing of a holistic regional development programme whose goal is to increase economic activity in selected regions of Mongolia while at the same time reducing pressure on the environment from overgrazing by livestock. The project will provide basic infrastructure to those areas of secondary and tertiary urban centres, which currently lack infrastructure. In addition, the project will require strengthening and renovation of existing urban infrastructure, construction of waste water treatment plants where these plants are missing, construction of affordable housing, renovation (including improvement of energy efficiency) of public buildings such as schools and hospitals, flood protection, drainage and construction of renewable energy generating facilities in the form of photovoltaic (PV) panels on top of or next to public buildings.

    Secteur(s)

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    USD 120 million (EUR 102 million)

    Coût total (montant approximatif)

    USD 294 million (EUR 250 million)

    Aspects environnementaux

    The project is a Framework Loan operation. If located in the EU, some of the schemes might have fallen under Annex II of the EIA Directive and would need to be screened by the Competent Authority. Should any scheme be screened in, the Promoter shall deliver the Environmental Impact Study, and if applicable the social assessment, to the Bank, before Bank funds can be allocated under the loan.

    Passation des marchés

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 29/12/2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Mongolie Aménagement urbain