Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100643
    Date de publication: 20 juin 2011

    Promoteur – Intermédiaire Financier

    Metro Warszawskie Sp. z o. o.

    Lieu

    Description

    Purchase of 35 new trains for the Warsaw metro, of which 20 will operate on the new line II, and 15 are to increase the service level on the existing line I. The acquisition of the new rolling stock for line II is part of the wider project entitled “Metro Line II in Warsaw – Preparatory Works, Design and Construction of the Central Section with Rolling Stock Procurement”.

    Objectifs

    The project, with the acquisition of the new tram vehicles, will improve the quality of public transport service in terms of speed, comfort and reliability and will increase the attractiveness of public transport in the urban area, thus contributing to reduce reliance on private cars and the negative impact of transport on the environment.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to PLN 554 million (ca. EUR 144 million)

    Coût total (montant approximatif)

    Approx. PLN 1 150 million (ca. EUR 299 million)

    Aspects environnementaux

    The acquisition of new rolling stock does not fall within the scope of the EU Directive 85/337/EEC (as subsequently amended), therefore no EIA is required for the project. The project can be expected to contribute to an overall improvement of the urban environment thanks to the better environmental performances of new vehicles, and by contributing to the promotion of public transport.

    Passation des marchés

    The Promoter is subject to and follows EU procurement procedures (namely, Directive 2004/17/EEC) including publication in the EU Official Journal. The Bank will require the Promoter to ensure that the contracts under the project shall be tendered in accordance with these regulations, including publication of tender notices in the EU Official Journal. Under these circumstances, the procurement procedures applied by the Promoter are suitable for the project and acceptable to the Bank.

    Statut

    Signé - 17/12/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports