Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20040522
    Date de publication: 22 octobre 2004

    Promoteur – Intermédiaire Financier

    EGNATIA ODOS S.A.
    Contact: Mrs Papassiopi

    Lieu

    Description

    The proposed project consists of the design and construction of the final section of the Egnatia road axis (TEN) concerning in total 36km of motorway constructed as a dual carriageway, 22m wide, including a considerable number of tunnels, bridges and interchanges. The project will link the other sections of the Egnatia road axis already financed by the Bank.

    Objectifs

    The proposed project, forming part of the ongoing implementation of the Egnatia road axis, is in technical terms one of the most critical parts of the road axis. The completion of the Egnatia road axis will allow substantial travel time-savings and greatly assist private and commercial transport in the area of northern Greece and the Balkans. It will also connect Turkey to central Europe through a high standard motorway.

    Commentaires

    Regional Development and Infrastructure of European Interest.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 350m.

    Coût total (montant approximatif)

    Up to EUR 700 m.

    Aspects environnementaux

    The project is subject to an Environmental Impact Assessment (EIA) in accordance with national legislation (the project falls under Annex I of EU Directive 97/11). An EIA study has been already approved and the Joint Ministerial Decision approving the environmental terms has been issued.

    Passation des marchés

    The project will be implemented under a number of separate works, supply and services contracts, which will be procured in line with the requirements of the relevant EU Procurement Directive. Details will be verified during appraisal.

    Statut

    Signé - 21/12/2005

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Transports