Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20200460
    Release date: 1 September 2021

    Promoter – Financial Intermediary

    DALKOMSOMALIA LLC

    Location

    Description

    The project entails the connection of Somalia to the largest submarine cable system in Africa, which will significantly enhance the resilience, quality and capacity of the country's international connectivity. The project also includes the deployment of the first segment of a new national fibre optic backbone to interconnect the capital city with regional hubs, enabling them to access the country's new high quality connection to the internet.

    Objectives

    The project seeks to significantly improve Somalia's digital infrastructure by diversifying the country's international connectivity and enabling the expansion of broadband networks into previously underserved areas. The investments supported by the EIB financing will lead to an accelerated market uptake of broadband services, driven by an increased affordability among the population. The project entails various socio-economic benefits derived from Somalia's digital transformation, COVID-19 pandemic recovery and enhanced cross-sectoral economic resilience.

    Sector(s)

    • Telecom - Information and communication

    Proposed EIB finance (Approximate amount)

    USD 14 million (EUR 13 million)

    Total cost (Approximate amount)

    USD 29 million (EUR 26 million)

    Environmental aspects

    If it were located within the EU, the project would not require a mandatory environmental impact assessment (EIA), as it does not fall under Annex I or II of the EIA Directive 2014/52/EU amending the Directive 2011/92/EU. Typically, the rollout of telecommunication networks have limited environmental and social negative effects, apart from short duration disturbances during network deployment, whenever civil works are required, which can be mitigated by appropriate measures. Full environmental and social details will be assessed during appraisal, with particular focus on the submarine cable and fibre optics backbone, which are the project components that will require relevant construction works, and environmental and social studies may be required by the Bank.

    Procurement

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Status

    Under appraisal - 14/10/2020

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Somalia Telecom