Search En menu ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Summary sheet

    Release date
    4 October 2016
    Status
    Reference
    Approved | 17/03/2017
    20160352
    Project name
    Promoter - financial intermediary
    FEC MUNICIPAL INFRASTRUCTURE FL
    FONDS D'EQUIPEMENT COMMUNAL
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 75 million
    EUR 150 million
    Location
    Sector(s)
    Description
    Objectives

    Framework loan to support infrastructure investments by local authorities throughout Morocco

    The project involves the financing through a framework loan of a series of local investments in Morocco, notably in construction, rehabilitation and upgrading of urban infrastructure (e.g. souks, sport facilities, urban roads, public lighting), mobility (e.g. intermodal stations and park and ride) and the water and wastewater sectors. Some of these investments might be linked to energy efficiency (e.g. building renovation, street lighting) and renewable energy (e.g. solar photovoltaics).

    Environmental aspects
    Procurement

    The overall environmental and social impact of the framework loan is expected to be positive, with improvements to the environment and citizens' quality of life, in particular with regard to the public transport system, urban road network, wastewater management and energy efficiency (EE) in buildings and public lighting. Furthermore the project is expected to contribute to climate action (e.g. sustainable transport and EE measures). The nature of the works may cause some disruption during construction such as traffic, noise and dust which can be largely mitigated, but there should be no adverse impact on the environment during the operational phase. The project's compliance with all applicable national environmental legislation as well as with EU environmental and social principles, standards and practices will be verified during appraisal.

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Under ELM Guarantee

    This operation is covered by the ELM Guarantee.

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - FEC MUNICIPAL INFRASTRUCTURE FL
    Publication Date
    21 Jul 2017
    Document language
    Main Topic
    Lending
    Document Number
    69232782
    Document Focus
    Environmental Information
    Project Number
    20160352
    Sector(s)
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications