Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20210773
    Veröffentlichungsdatum: 23 November 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    WINGCOPTER GMBH

    Ort

    Beschreibung

    Wingcopter GmbH is a German aerospace company that develops and operates cutting-edge electric cargo drones to provide last-mile delivery services for third parties across a wide range of geographies. The funding will be used to finance the deployment of efficient and green middle- and last-mile logistics solutions using Wingcopter drones, thus replacing current expensive and emission-heavy road or air transportation.

    Additionality and Impact

    The Project contributes to the EIB's objective of sustainable transport, decarbonisation and digitalisation of transport. Deployment of electric unmanned aerial vehicles (UAVs) in freight transport supports the shift to sustainable transport means and reduces negative transport environmental externalities. This is a dynamic and emerging new sector within an evolving regulatory framework, and consequently higher risks and so a sub-optimal investment situation.


    The Project contributes to address the market gap in rapid, low cost, green (zero-emission) last mile, time sensitive deliveries - especially to deep rural and hard-to-reach areas, and consequently result in efficiency gains in last mile logistics by promoting innovation in transport systems, lead to more efficient pricing of some transport services and promoting the digitalization/ automation of air traffic information management. In addition, the EIB support in deploying UAVs in Europe facilitates scaling-up and learning in this field.


    By using energy efficient, zero-emission UAVs in freight transport, the Project reduces CO2 emissions and air pollutions (NOx, PM). Additional benefits for freight operators are expected due to reduced vehicle operating costs (VOCs) using more energy efficient assets for deliveries to distant and low density/ low traffic locations. This effect is assumed to justify operators' investments in UAVs on top of their existing fleets and to be absorbed in market demand forecasts of the Project. Furthermore, deploying large number of electric UAVs will substantially improve electric mobility supply.


    Overall, EIB's intervention will provide equity-like risk capital for the Company at a critical time in its development and scaling up of its technology and services, which eventually should enable the Company to provide last mile delivery services on a global basis using UAVs at a competitive cost by transitioning logistics services away from fossil-fuel based means of transport, such as cars, vans or helicopters/ light aircraft.


    The project would not have been carried out (to the same extent) by the EIB without the InvestEU support.

    Ziele

    The project will contribute to supporting the development, production, deployment and operation of Wingcopter's electric unmanned aerial vehicles (eUAVs), enabling the company to provide last-mile delivery services at a global scale and a competitive cost while reducing greenhouse gas emissions and air pollution caused by fossil fuel-based means of transport.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 40 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 125 million

    Umweltaspekte

    The deployment of drones and associated infrastructure does not fall under Annex I or Annex II of the Directive 2014/52/EU amending the Directive 2011/92/EU on the assessment of the effects of certain public and private projects on the environment (EIA Directive), meaning that a screening decision by the Competent Authority (CA) based on these criteria is not required.

    Auftragsvergabe

    The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions.

    Projektstatus

    Unterzeichnet - 23/12/2022

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    21 Dezember 2022
    23 Dezember 2022

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Deutschland Verkehr