Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20160017
    Release date: 18 January 2017

    Promoter – Financial Intermediary

    PRIVATE ENTITY(IES)

    Location

    Description

    The project will finance the construction of an eco-campus in Fez, with research facilities and equipment, teaching facilities, a student residency and sport facilities.

    Objectives

    This new institution is co-developed with several European academic partners in order to offer training up to European standards, degrees certified for the European market, conduct high quality research and create cultural and economic bridges between the two shores of the Mediterranean Sea.

    Sector(s)

    Under ELM Guarantee

    This operation is covered by the ELM Guarantee.

    Proposed EIB finance (Approximate amount)

    EUR 84 million

    Total cost (Approximate amount)

    EUR 147 million

    Environmental aspects

    A project with similar characteristics within the EU would be classified under Annex II of Directive 2011/92/EU as amended by Directive 2014/52/EU, thus requiring a decision by the competent authority as to whether or not a formal environmental impact assessment (EIA) process is required. In an EU member state, universities specifically mentioned in the EIA Directive would not normally require an EIA. However, the projects could be covered by Annex II of the directive in relation to urban development and thus be subject to an EIA. The need for environmental studies and assessment has been reviewed during the appraisal process. The promoter has provided the EIB with the non-technical summary of the EIA carried out at building permit stage.

    Procurement

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Status

    Signed - 7/07/2017

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Morocco Services Education