Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20040329
    Date de publication: 28 avril 2005

    Promoteur – Intermédiaire Financier

    Ministry of Transport and Communication, Road Directorate

    Lieu

    Description

    Construction of a 29 km long 4-lane motorway between Banja Luka, the capital of Republika Srpska, and Corridor X, including a bridge over river Sava.

    Objectifs

    Improvement of national and regional transport links with neighbouring countries, reduction of traffic congestion, alleviation of air and noise pollution on the existing road, and better prospects for the residential, industrial and commercial development in the region.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 65 million.

    Coût total (montant approximatif)

    Up to EUR 130 million.

    Aspects environnementaux

    Designs for the construction of a new motorway will ensure that proper attention is given to all environmental concerns in line with the Bank’s guidelines.

    Passation des marchés

    Procurement procedures will be on the basis of international competitive bidding in line with the Bank’s guidelines.

    Statut

    Signé - 17/11/2005

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bosnie-et-Herzégovine Transports