    Reference: 20140106
    Release date: 29 August 2014

    Promoter – Financial Intermediary

    KYRGYZ REPUBLIC
    REPUBLIC OF TAJIKISTAN

    Location

    Description

    Construction of power-transmission infrastructure in Kyrgyzstan and Tajikistan. The proposed schemes form part of a larger regional project led by the World Bank and involving four Asian countries (Kyrgyzstan, Tajikistan, Afghanistan and Pakistan).

    Objectives

    The objective of the “Central Asia-South Asia Electricity Transmission and Trade Project” (“CASA-1000”) is to create the conditions for sustainable trade of renewable electricity (hydro) between the Central Asian countries of Tajikistan and Kyrgyzstan and the South Asian countries of Afghanistan and Pakistan, thus alleviating power supply shortages in the aforementioned South Asian countries and enhancing revenues in Tajikistan and Kyrgyzstan.

    Comments

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 140 million

    Total cost (Approximate amount)

    EUR 282 million

    Environmental aspects

    High voltage transmission lines require an EIA to be carried out.

    Procurement

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank’s Guide to Procurement.

    Status

    Signed - 23/12/2014

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).