Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20120664
    Release date: 22 May 2014

    Promoter – Financial Intermediary

    MINISTRY OF TRANSPORT

    Location

    Description

    Construction of several sections of the Warsaw-Lublin stretch of the S17 and S12 expressways.

    Objectives

    The project concerns two sections of the expressway S17 Warsawa – Garwolin – Kurow and one section of the expressway S12 Pulawy – Kurow of a total length of approx. 107.2 km in Mazowieckie and Lubelskie voivodships in Poland.

    Comments

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 320 million

    Total cost (Approximate amount)

    EUR 1049 million

    Environmental aspects

    The schemes fall under Annex I of the EIA Directive 2011/92/EU requiring a full EIA procedure. One section, the S17 from Lubelska interchange to the border of the Lubelskie voivodship is 9 km away from the nearest Natura 2000. The other sections of the S17 and S12 will cut/come close to the following Natura 2000 /Protected Areas (PA) :Pradolina Wieprza, and Kozi Bor (PA) ;Dolina Wieprza, Pulawy (N 2000 areas). Therefore, the provisions of the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) apply. The procedures are to be further reviewed during appraisal.

    Procurement

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Status

    Signed - 15/10/2014

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Poland Transport