REGION AQUITAINE LYCEES HQE
- Reference: 20120302
- Release date: 19 September 2012
REGION AQUITAINE
- France
The Project consists in expanding and retro-fitting high schools ("lycées" and higher education buildings) infrastructure so as to meet increasing capacity requirements and to achieve the Region's Aquitaine ambitious energy efficiency targets, for a total cost in excess of EUR 1bn.
The programme will include the two first “lycées” in France to be built with a view to achieving the BEPOS ("bâtiment énergie positive" -positive energy building) standards.
- Health, Education
EUR 500 million
Total cost (Approximate amount)EUR 1350 million
Environmental aspectsThe project includes new buildings, extensions and renovation of existing senior secondary schools, lycées. The Directive 2011/92/EU does not specifically mention the need for an Environmental Impact Assessment (EIA) for buildings related to education, but it may be that some sub-projects can be regarded as urban renewal projects and might require an EIA (Annex II of the European Directive). This will be examined during the appraisal.
The procedures for tendering and procurement used by the promoter must comply with the Community directives on procurement (Directives 2004/17/EC and 2004/18/EC amended by Regulation 1874/2004). The procedures will be analysed during the appraisal.
Signed - 22/11/2012.
- 09-10-2012 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) FR
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. Therefore data provided on this page is indicative and cannot be considered to represent official EIB Policy (see also the Explanatory notes).












