corporate_banner_en

OEBB AUSBAU WESTBAHN

Projects
Regions
European Union
Enlargement countries
Turkey
Iceland
Western Balkans
European Free Trade Association
Mediterranean Neighbourhood
FEMIP Overview
Supporting pan-Mediterranean initiatives
Financing & advice
FEMIP Loans
Private equity
Advisory & technical assistance
FEMIP Support Package
Procurement
How to apply
Trust Fund
Technical assistance
Private equity
Global dialogue
Partnerships
Organisation and staff
FEMIP Internship Programme
FAQ - FEMIP
EU Eastern Neighbours
Projects
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Institutional framework
Applying for loans
Organisation and staff
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Applying for loans
Organisation and staff
Sub-Saharan Africa, Caribbean and Pacific
Funding and Financial Instruments
Applying for loans
Cooperation with partners
Investment Facility
Other initiatives
Activities
Asia and Latin America
Priorities
SMEs
Innovative options
Loans
Microfinance
EU partners for SMEs & mid-caps
Non-EU partners for SMEs & mid-caps
RDI support
Equity investment
Regional development
Climate Action
Urban & natural environment
Innovation
Skills and Jobs
Trans-European Networks
Transport
Energy
Project Cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be Financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin & Central America
Breakdown by sector
Projects Financed
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Multi-criteria list
Operations Evaluation
Organisation and Programme
Programme
Methodology
Criteria
Rating scale
Process
Reports
Operations
Overview
Publications and reports
Cooperation and Coordination
ECG
European Financial Institutions
European Commission
Contacts

OEBB AUSBAU WESTBAHN

  •  Reference: 20120198
  •  Release date: 10 June 2012
Promoter – Financial Intermediary

OEBB-INFRASTRUKTUR AG

Location
Description

The project consists of adding capacity to two important bottlenecks in the Danube Axis, integral part of the TEN-T priority project No. 17 (railway axis Paris-Strasbourg-Stuttgart-Vienna-Bratislava), as part of the Austrian Government’s decision to increase capacity along this busy corridor. Two additional tracks will be added to the existing double track in sections in St. Pölten - Loosdorf (25 km long by pass) and Ybbs – Amstetten (17 km).

Objectives

The project will add capacity, operational flexibility and reliability, allow faster train operation, and improve comfort in one of the busiest rail corridors in Austria. The removal of the capacity bottlenecks will deter future demand from having to use road instead of rail. Furthermore, additional demand could be expected as a result of a better rail offer. This will result in travel time savings, less energy consumption, lower operation costs and fewer accidents, and will thus promote sustainable transport. The new by-pass section will also improve the noise conditions in urban areas as freight trains will no longer need to cross through the city.

Comments
 
Sector(s)
Proposed EIB finance (Approximate amount)

EUR 600 million

Total cost (Approximate amount)

EUR 1300 million

Environmental aspects

The construction of railways falls under Annex I of the EU EIA Directive, and consequently a full EIA is required. A separate EIA has been completed for both new railway sections of this project. The rehabilitation and upgrading of the existing railway falls under Annex II of the EU EIA Directive, according to which the need for a full EIA is decided on a case-by-case analysis by the Competent Authority. During the appraisal it will be examined that all parts of the project comply with EU Directives on the environment, including the EIA Directive 85/337/EEC, the Habitats Directive 92/43/EEC and the Birds Directive 79/409/EEC. The question of the projects falling within a plan or a programme requiring a Strategic Environmental Assessment (SEA) in line with EU Directive 2001/42/EC will also be further examined during appraisal.

Procurement

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EEC/ or 2004/17/EEC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Status

Signed   -   26/11/2012.

Related Documents
  • 10-09-2012 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) DE

Related Documents (in the Public Register)

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).



 Print
Copyright © European Investment Bank 2014
The European Investment Bank is not responsible for the content of external internet sites.

http://www.eib.org/projects/pipeline/2012/20120198.htm