Investments in water distribution (Autovía del Agua) and sanitation (Plan de Saneamientos) in Cantabria, Spain. The sanitation portion of the project is partially included in the Operational Programme Environment (OPE) and cofinanced by FEDER funds.
Objectives
The project aims at improving the capacity and operational flexibility of water transfer between the different small river basins; it will increase the availabilityof water supply to the coastal populations during drought periods and hence is expected to improve climate change resilience.
Comments
Sector(s)
Water, sewerage, solid waste
Proposed EIB finance (Approximate amount)
EUR 50 million
Total cost (Approximate amount)
EUR 100 million
Environmental aspects
The project, consistent with the Water Framework Directive (2000/60/EC), will optimise the availability of water resources and thus increase the water supply reliability in a context of water scarcity. It will also have a strong positive effect on the environment, contributing to pollution abatement by improving the quality of effluents discharged to surface and coastal waters of the Cantabrian Sea.
Procurement
The promoter is a public entity and tender procedures are required to comply with the Spanish national legislation, Ley 30/2007 de Contratos del Sector Público which is in line with the EC public procurement Directives (Dir 2004/18/EEC/, 2004/17/EEC and Dir. 2007/66/EC). This is acceptable to the Bank.
Status
Signed
-
28/11/2012.
Related Documents
26-07-2012 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) ES
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. Therefore data provided on this page is indicative and cannot be considered to represent official EIB Policy (see also the Explanatory notes).
The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities. Enquiries and comments regarding the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, EIB can also be contacted through its external offices.
Queries regarding details of a specific project, in particular when EIB loan is under appraisal, should be preferably addressed directly to project promoters.
Any complaint regarding alleged maladministration can be lodged to EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.
Zero-tolerance against fraud and corruption
The EIB has a zero-tolerance policy on fraud or corruption. To report allegations of fraud or corruption in EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential, and are handled in line with EIB investigation procedures and the Anti-Fraud Policy.
The EIB is committed to achieving the highest possible level of transparency. The EIB Transparency Policy sets out how EIB discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations.