Investments in water distribution (Autovía del Agua) and sanitation (Plan de Saneamientos) in Cantabria, Spain. The sanitation portion of the project is partially included in the Operational Programme Environment (OPE) and cofinanced by FEDER funds.
Objectives
The project aims at improving the capacity and operational flexibility of water transfer between the different small river basins; it will increase the availabilityof water supply to the coastal populations during drought periods and hence is expected to improve climate change resilience.
The project, consistent with the Water Framework Directive (2000/60/EC), will optimise the availability of water resources and thus increase the water supply reliability in a context of water scarcity. It will also have a strong positive effect on the environment, contributing to pollution abatement by improving the quality of effluents discharged to surface and coastal waters of the Cantabrian Sea.
Procurement
The promoter is a public entity and tender procedures are required to comply with the Spanish national legislation, Ley 30/2007 de Contratos del Sector Público which is in line with the EC public procurement Directives (Dir 2004/18/EEC/, 2004/17/EEC and Dir. 2007/66/EC). This is acceptable to the Bank.
Status
Signed
-
28/11/2012.
Related Documents
26-07-2012 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) ES
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).
The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities. Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.
The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.
The EIB is committed to achieving the highest possible level of transparency. The EIB Transparency Policy sets out how the EIB discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations.