Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20120008
    Release date: 6 August 2013

    Promoter – Financial Intermediary

    TANGENZIALE ESTERNA SPA

    Location

    Description

    The project consists in the construction of a new 32-km long toll motorway and ancillary works building the Eastern External bypass of the city of Milan (i.e.: TEEM), which will link the motorway A4 (Milano-Venezia) at Agrate Brianza, in the north, to the motorway A1 (Milano-Bologna) at Melegnano, in the south.

    Objectives

    The proposed new motorway will relieve traffic congestion along the eastern bypass corridor of Milan. It is therefore expected to result in substantial travel time savings, as well as in a reduction in trafic. The project is also expected to have a positive impact on air quality and greenhouse gas benefits by reducing trafic and thus motor vehicles emissions.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 700 million

    Total cost (Approximate amount)

    EUR 1400 million

    Environmental aspects

    The project will be required to comply with the relevant national and regional legal framework, and to be in line with EU environmental policies. The Promoter has already provided some documentationfor approval to the Competent Authorities. The compliance with the EIA Directives will be discussed and verified during appraisal.

    Procurement

    The Bank will require the Promoter to ensure that contracts for the award of the concession and implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EEC and Dir. 2007/66/EC), with parallel publication of tender notices in the EU Official Journal, as and where appropriate.
    During appraisal, the Bank will review the appropriateness of the procurement procedures and require that they are compliant with the applicable EU directives.

    Status

    Signed - 27/02/2014

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Italy Transport