Transmission Line Kafue-Livingstone

Projects
Regions
European Union
Enlargement Countries
Definitions
Croatia
Turkey
Iceland
The Western Balkans
FYROM
Montenegro
Mediterranean neighbourhood
FEMIP Overview
Supporting pan-Mediterranean initiatives
Financing & advice
FEMIP Loans
Private equity
Advisory & technical assistance
FEMIP Support Package
Procurement
How to apply
Trust Fund
Technical assistance
Private equity
Global dialogue
Meetings: A place for dialogue
Conferences
Partnerships
Organisation and staff
FEMIP Internship Programme
FAQ - FEMIP
EU Eastern Neighbours
Projects
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Institutional framework
Applying for loans
Organisation and staff
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Applying for loans
Organisation and staff
Sub-Saharan Africa, Caribbean and Pacific
ACPs and OCTs
Applying for a loan
Products and Services
Subsidies
Technical assistance
Strategic Focus
The Republic of South Africa
Applying for a loan
Financial Instruments
Strategic Focus
Organisation and Staff
Regional Offices
Caribbean
Central and Eastern Africa
Pacific
Southern Africa and Indian Ocean
West Africa and Sahel
Other initiatives
Asia and Latin America (ALA)
Priorities
SMEs
Other Credit Lines
Working capital
Innovative financing options
Loans for SMEs
SME support outside the EU
Capital injection and development advice
Regional development
Promoting environmental Sustainability
Urban Environment
Sustainable transport
Water Supply and Sanitation
Climate Action
Carbon finance
Renewable Energies and Energy Efficiency
Biodiversity
Responsibility and Sustainability
Access to Environmental Information
Information directly available
Information available on request
Applications for information
Other useful sources of information
Organisation
EPE
Declaration
Supporting Material
The Environmental Acquis
Objectives and Principles
Treaties
Signatory Banks
NIB
NEFCO
EIB
CEB
EBRD
Innovation
Education
Research and Development
Inventing the future
Trans-European Networks (TENs)
Added Value
European Action for Growth and the TENs Investment Facility
Financing of TEN Projects
Energy
External Security
Diversification and Security
Human Capital
Health
Education
Project Cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be Financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin & Central America
Breakdown by sector
Projects Financed
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin & Central America
Breakdown by sector
Multi-criteria list
Operations Evaluation
Organisation and Programme
Programme
Methodology
Criteria
Rating scale
Process
Reports
Operations
Overview
Publications and reports
Cooperation and Coordination
ECG
European Financial Institutions
European Commission
Contacts

Transmission Line Kafue-Livingstone

  •  Reference: 20100457
  •  Release date: 30 March 2011
Promoter – Financial Intermediary

ZESCO Ltd

Location
  • Zambia
Description

The project consists of upgrading the existing 220 kV high voltage transmission line Kafue-Muzuma-Livingstone to 330 kV voltage, with extensions to the corresponding high voltage substations. The transmission line corridor and towers remain the same. The upgrade approximately doubles the transmission capacity, and removes several bottlenecks of power transmission inside Zambia and regionally within the Southern African Power Pool (SAPP) market.

Objectives

The purpose of the project is to reinforce and upgrade the power transfer capability of the main transmission lines in Zambia to increase the reliability and quality of domestic power transmission service and to facilitate regional power trade between Zambia and Namibia and other Southern African Power Pool members. The project forms a part of the new SAPP north-south connection (through Caprivi link) that bypasses the heavily overloaded and unreliable network section of Zimbabwe.

Comments
 
Sector(s)
  • Energy
Proposed EIB finance (Approximate amount)

EUR 22 million

Total cost (Approximate amount)

EUR 67 million

Environmental aspects

If implemented within EU, the project would fall under Annex II of EIA Directive, leaving it to the competent environmental authority to decide the need of the EIA. The financiers’ environmental and social safeguards are considered to require an ESIA, and this work is under implementation. The upgrade of the line is expected to have only small environmental impacts. The Resettlement Action Plan is being drafted, and the necessary safeguards for the affected people are expected to be in place (to be reviewed during appraisal).

Procurement

The procurement of the section to be financed by the Bank will be carried out in line with the requirements of the Bank’s Guide to Procurement. The other contracts will also be tendered internationally, in line with the rules of the other lenders involved.

Status

Signed   -   17/05/2012.

Related Documents
  • 20-05-2011 - Environmental Impact Assessment (EIA) EN

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. Therefore data provided on this page is indicative and cannot be considered to represent official EIB Policy (see also the Explanatory notes).