CLSG INTERCONNECTION
- Reference: 20090712
- Release date: 22 August 2012
WEST AFRICAN POWER POOL
- West Africa
The power interconnection between Côte d'Ivoire, Liberia, Sierra Leone and Guinée (CLSG) is a priority project of the West African Power Pool (WAPP) that will enable power exchanges between the four countries.
This project will enable power exchanges between Côte d'Ivoire, Liberia, Sierra Leone and Guinée, thereby improving the supply of electricity in these post-conflict countries. In the medium term, the project should enable the development of the hydropower potential of Guinée. In Sierra Leone, the availability of low cost and reliable electricity is a necessary prerequisite for the recovery of economic and human development activites.
- Energy
EUR 75 million
Total cost (Approximate amount)EUR 370 million
Environmental aspectsThe project, if implemented inside the EU, would fall under Annex 1 of EIA directive, requiring an EIA. The promoter has conducted an ESIA with an international consultant. The process has included public consultation. The identified environmental risks are typical for high voltage transmission projects, including vegetation and forest cleaning, visual impact, avifauna collisions and resettlement of people from transmission corridor. The study includes appropriate mitigating measures like re-routing the line at the areas of environmental hotspots, visual impact minimisation and resettlement action plan.
The Bank will require that the procurement is carried out in accordance with the EIB's Guide to Procurement and will provide guidance to the promoter.
Signed - 10/12/2012.
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. Therefore data provided on this page is indicative and cannot be considered to represent official EIB Policy (see also the Explanatory notes).