Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 80,000,000
    Countries
    Sector(s)
    Zambia : € 80,000,000
    Transportes : € 80,000,000
    Signature date(s)
    8/12/2011 : € 80,000,000
    Other links

    Summary sheet

    Release date
    24 August 2010
    Status
    Reference
    Signed | 08/12/2011
    20090648
    Project name
    Promoter - financial intermediary
    Great East Road Rehabilitation Project

    Contact point: RDA, Mr Elias Mwape, Chief Engineer – Planning
    Phone +260 211 253 088 or +260 211 253 002/ Fax: +260 211 253 404 e-mail: emwape@roads.gov.zm.

    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 80 million.
    Indicative amount: EUR 250 million.
    Location
    Sector(s)
    Description
    Objectives

    Improvement of about 360 km of single carriageway highway on the Great East Road connecting central Zambia to its eastern province, as well as into the “Nacala Development Corridor”, a regional transport corridor linking Malawi and Zambia to the deep water port of Nacala in Mozambique.

    The project is expected to generate savings in vehicle operating costs and travel time as well as reduce the risk of road accidents. The project feeds the Nacala Corridor, which, when fully upgraded, will offer a significantly shorter route to/from the sea for Zambian imports and exports than other existing routes through South Africa and Tanzania. The EIB contribution is expected to include the works for developing a dry port (road-rail interconnector) in Chipata.

    Environmental aspects
    Procurement

    An EIA procedure, in accordance with applicable standards, was undertaken and submitted to the Competent Authority (Environmental Council of Zambia, ECZ) for approval. In its letter dated 9th July 2010, the ECZ approved the present project.

    The promoter is a public authority and, if operating as a contracting entity in the EU, would be subject to the provisions of the public procurement Directive 2004/18. The promoter will therefore be required to undertake procurement in accordance with the EIB Guide to Procurement which imposes the main mechanisms of the EC Directives.

    Other links

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications