Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20080446
    Release date: 4 August 2009

    Promoter – Financial Intermediary

    Ministry of Transport and Communications
    4, Crvena Skopska Opstina
    1000 Skopje
    Tel. +389 2 3145 519

    Location

    Description

    The project concerns the promoter’s capital investment programme for the years 2009 to 2013 which is driven by the need to increase water supply in rural areas and to improve waste water disposal throughout the country, in compliance with the relevant EU Directives. The programme loan concerns investments in most of the 84 municipalities of the country.

    Objectives

    The investments are aimed on the one hand at preparing for compliance with the EU ‘acquis communautaire’ in the broader water sector, and on the other hand at improving living standards and providing a framework for economic development in medium and small-sized towns and villages.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 50 million.

    Total cost (Approximate amount)

    EUR 100 million.

    Environmental aspects

    The project will generally benefit the environment and public health, either by providing better drinking water to the population, improving the efficiency of the treatment and distribution facilities, or by collecting and cleaning wastewater before discharging into receiving waters. As an EU candidate member state, the project will contribute to FYROM’s future compliance with EU standards and regulations on water, sanitation and the environment.Compliance with national EIA legislation that has been drafted by transposing EU EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC will be verified during the appraisal. With regards to regulations concerning the protection of habitats, respective EU Directives are considered to be transposed, subject to verification during appraisal. FYROM is part of the international EMERALD network, and procedures for compliance herewith will also be verified. A social assessment will also be undertaken as part of the appraisal.

    Procurement

    The Bank will require the Promoter to ensure that contracts for the implementation of the Project shall be tendered in accordance with the relevant EU procurement legislation (2004/17/EC) with parallel publication of tender notices in the EU Official Journal where applicable.

    Status

    Signed - 14/07/2010

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    North Macedonia Water, sewerage