The Greek State through the Ministry of Environment, Physical Planning and Public Works (MEPPPW).
Location
Greece
Description
The entire concession project is a TEN, with the section between Elefsina and Patras (184 km) being a priority TEN (section of PATHE Motorway) and the remaining 182 km being part of the Trans-European Road Network (TEN-T ) in Greece.
Objectives
The project will improve road access to/from western and northern Peloponnese from/to Athens Metropolitan area and the northern regions of Greece. The proposed motorway sections will improve traffic conditions and reduce travel times, road accidents and vehicle-operating costs.
Comments
Sector(s)
Transport
Proposed EIB finance (Approximate amount)
EUR 200 million.
Total cost (Approximate amount)
EUR 2.800 million.
Environmental aspects
The project may fall under the Strategic Environmental Assessment (SEA) Directive (EU Directive 2001/42). The environmental aspects of the project will be reviewed during appraisal.
Procurement
The project is being procured as a PPP in conformity with the relevant EU Directives. Procurement was advertised in the Official Journal (S12-008206/18.01.2001; 2001/S54-037211/17.03.2001 and 2001/S91-062118/12.05.2001) and following a pre-qualification process four consortia were invited to bid by Ministerial Decision dated 16.06.2006. Two consortia, Apion Kleos and Hellenic Autopistas submitted binding offers on 18.12.2006. Apion Kleos was announced preferred bidder on 24.04.2007.
Status
Signed
-
19/05/2008.
Related Documents
10-12-2007 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) EL
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. Therefore data provided on this page is indicative and cannot be considered to represent official EIB Policy (see also the Explanatory notes).
The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities. Enquiries and comments regarding the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, EIB can also be contacted through its external offices.
Queries regarding details of a specific project, in particular when EIB loan is under appraisal, should be preferably addressed directly to project promoters.
Any complaint regarding alleged maladministration can be lodged to EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.
Zero-tolerance against fraud and corruption
The EIB has a zero-tolerance policy on fraud or corruption. To report allegations of fraud or corruption in EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential, and are handled in line with EIB investigation procedures and the Anti-Fraud Policy.
The EIB is committed to achieving the highest possible level of transparency. The EIB Transparency Policy sets out how EIB discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations.