Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20070089
    Veröffentlichungsdatum: 12 September 2008

    Projektträger – zwischengeschaltetes Finanzinstitut

    Egyptian Ministry of Electricity and Energy through the New and Renewable Energy Authority (NREA)

    Ort

    Beschreibung

    The project concerns the studies, design, construction, commissioning and operation of a large-size (up to 200 MWe) onshore windfarm. The site of a size of about 36 km² is characterised by very favourable wind resources (expected load factor ~45%) from mainly the north-west direction. The project is part of a larger national programme in the same region to further expand power generation from renewable energy in Egypt. Co-financing with other European institutions is envisaged.

    Ziele

    The project will contribute to meet growing electricity demand using sustainable wind energy resources. The project is fully in line with the strategic objectives set for the external mandate in general (environmental sustainability, climate change mitigation), and for the FEMIP mandate in particular (energy, EU regional and common interest). The project contributes to the development of renewable energy in Egypt, one of the stated objectives of the country’s energy policy. The operation will also contribute to the Bank’s priority energy lending objectives related to renewable energy and external energy security and economic development.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 50 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Indicatively estimated at around EUR 340 million.

    Umweltaspekte

    If the project were located within the EU it would fall under Annex II of the EIA-Directive. Environmental impact studies (EIS) have been prepared, covering the project site and a larger area, and complemented by a comprehensive bird migration study. Based on these studies the national competent authority has granted approval , subject to i.a. a satisfactory environmental monitoring programme.

    Auftragsvergabe

    Within the EU the promoter, being a public contracting authority, would be subject to public procurement procedures according to 2004/17/EU, including publication of contract notices in the OJEU. In line with the Bank’s principles and its statute, the promoter will have to follow the provisions of the Bank’s Guide to Procurement, which includes amongst others international competitive bidding and OJEU contract notice publication for the items to be financed by the Bank, if appropriate.

    Projektstatus

    Unterzeichnet - 30/09/2009

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ägypten Energie