Projects
Regions
European Union
Enlargement Countries
Definitions
Croatia
Turkey
Iceland
The Western Balkans
FYROM
Montenegro
Mediterranean Neighbourhood
About FEMIP
FEMIP and the UfM
Instruments
FEMIP Loans
Private equity
Technical assistance
Technical Assistance for Projects
Procurement
Funding
Trust Fund
Technical assistance
Private equity
Institutional cooperation
Meetings
Conferences
8th FEMIP Conference, 2010
7th FEMIP Conference, 2010
6th FEMIP Conference, 2009
5th FEMIP Conference, 2009
4th FEMIP Conference, 2008
3rd FEMIP Conference, 2008
2nd FEMIP Conference, 2007
1st FEMIP Conference, 2006
Partnerships
Activities
FEMIP Overview
Countries and Sectors
Organisation and staff
FEMIP Internship Programme
FAQ - FEMIP
EU Eastern Neighbours
Projects
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Institutional framework
Applying for loans
Organisation and staff
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Applying for loans
Organisation and staff
Sub-Saharan Africa, Caribbean and Pacific
ACPs and OCTs
Applying for a loan
Products and Services
Subsidies
Technical assistance
Strategic Focus
The Republic of South Africa
Applying for a loan
Financial Instruments
Strategic Focus
Organisation and Staff
Regional Offices
Caribbean
Central and Eastern Africa
Pacific
Southern Africa and Indian Ocean
West Africa and Sahel
Other initiatives
Asia and Latin America (ALA)
Topics
SMEs: The EIB Group supports your financial investments
Other Credit Lines
Working capital
Guarantee instruments
Loans for SMEs
Intermediaries outside the EU
Capital injection
Cohesion and convergence
Promoting environmental Sustainability
Urban Environment
Sustainable transport
Water Supply and Sanitation
Climate Action
Carbon finance
Renewable Energies and Energy Efficiency
Biodiversity
Responsibility and Sustainability
Access to Environmental Information
Information directly available
Information available on request
Applications for information
Other useful sources of information
Organisation
EPE
Declaration
Supporting Material
The Environmental Acquis
Objectives and Principles
Treaties
Signatory Banks
NIB
NEFCO
EIB
CEB
EBRD
Innovation
Education
Research and Development
Inventing the future
Trans-European Networks (TENs)
Added Value
European Action for Growth and the TENs Investment Facility
Financing of TEN Projects
Energy
External Security
Diversification and Security
Human Capital
Health
Education
Project Cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be Financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin & Central America
Breakdown by sector
Projects Financed
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin & Central America
Breakdown by sector
Multi-criteria list
Operations Evaluation
Organisation and Programme
Programme
Methodology
Criteria
Rating scale
Process
Reports
Operations
Overview
Publications and reports
Cooperation and Coordination
ECG
European Financial Institutions
European Commission
Contacts
FAQ - Projects
FAQ - Loan Application
FAQ - Loan Conditions and Disbursement
FAQ - Procurement

The Bosphorus tunnel connects people at the heart of Turkey’s most vibrant metropolis

  •  Date: 15 February 2010

The EIB is taking part in one of the world's most ambitious urban transport schemes, known to the people of Istanbul as the Marmaray project: the development of a modern, high-capacity commuter rail system providing an effective transport solution for the citizens of Istanbul via a tunnel under the Bosphorus, and connecting the Asian and European sides of Istanbul. This will also enable the passage of high-speed trains to bring both parts of the city and the two continents closer together. First signed by the Bank in 2004, the crucial relevance of the EIB-supported project in terms of a transport network, as well as in forging closer ties between Turkey and the EU, was already realised by all the actors involved from its inception. It is the largest and most important infrastructure project undertaken in Turkey.

Istanbul is the country's economic engine and serves as a commercial and financial hub. Its metropolitan area is emerging as one of the largest in Europe, but its transport infrastructure struggles to keep up. The city's transport system is challenged by the accelerated pace of growth witnessed over the past few years. More than 12 million people live here and it attracts many more from outside who come to work in the city every day. The Bosphorus is the natural connection between the Mediterranean and the Black Sea, and between the European and Asian continents, but at the same time it is a natural barrier cutting the city in two. Each day, over a million trips are made across the Bosphorus by boat or using one of the two bridges over the straits. At rush hour, crossing the city can take up to five hours. The Marmaray rail link will provide a long-sought mass transport system and help to overcome the city's natural divide. The benefits are clear: reducing air and noise pollution by enabling a major shift from road to rail and alleviating congestion on the road network. Once it is operational, the new transport link is likely to attract more than 1.5 million passengers using the tunnel per day. The Marmaray project is also expected to result in a reduction of 144,000 tonnes of air pollution and greenhouse gases annually.

Building an intercontinental link

The tunnel will link the two railway lines on the so-called Pan-European Transport Corridor on either side of the Bosphorus. With a total length of 76.5km, the project includes the construction of 13.6km of double track tunnel, of which more than 1.3 km under the sea, and an additional third track on a length of over 62km connecting to other transport networks. Taking the project to another level, the EIB is additionally supporting the setting-up of a transport link of strategic importance by helping to finance the building of Turkey's first high-speed connection between the two major metropolises of Istanbul and Ankara.

The Marmaray project is the first of its kind, with no precedent in terms of its size and sophistication. Never before has an immersed tunnel been built at a depth of 60 metres, with the marine construction equipment for dredging and immersion of the tunnel elements operating in the congested shipping lanes and heavy currents of the Bosphorus. Underground stations and tunnels are being built underneath historical buildings in the densely populated urban areas of Istanbul. Ground settlements from the tunnel excavations risk resulting in severe consequences for people and buildings above ground unless they are carefully controlled at each and every step. A modern railway - the commuter rail system - is being fitted into an existing, narrow railway corridor right through the city. "The Marmaray is a huge, extremely complex and exciting project - I can't think of any challenge this project lacks," says Jens Peter Henrichsen, Project Manager from Avrasyaconsult, the joint venture preparing the project and overseeing the construction.

The Marmaray project is positioned in a very active seismic zone. Over the past few years, it has brought together seismic experts from Japan, the US and Turkey to build underground structures and a tunnel under the Bosphorus that will be safe even in the event of an earthquake. The immersed tunnel beneath the Bosphorus strait has now been completed along with many kilometres of tunnels on land.

Rewriting Istanbul's history

During the works on the Yenikapi station, which is to become one of the main hubs for traffic across the city, workers discovered that they had not been the first to start building at this site. What they found, bringing an ancient Theodosian harbour beneath the city to light, was a historical treasure from the Byzantine period. An armada of shipwrecks was lifted from the grounds of where one day the commuter rail and metro stations will be built. Archaeologists were able to secure 33 ships from the Theodosius port, a Byzantine church and thousands of artefacts from the historical site - enough to fill an entire museum. The findings forced historians to rewrite the books: whereas the beginnings of the city of Istanbul were previously believed to date back 2 700 years, the findings from the archaeological excavations revealed that the history of Istanbul stretches back some 8 500 years. Despite the delays that these findings have caused to the project, their cultural value is unique. "These archaeological findings would have not been possible if it were not for the Marmaray project and its engineers," Dr Ufuk Kocabaş from Istanbul University underlines.

"Marmaray was a typical project to receive support from the Bank, as it is an infrastructure undertaking with clear benefits to be gained, and which connects the people of Europe," explains Hakan Lucius, the Bank's loan officer in charge at the time. The year 2004 became a turning point as regards Turkish-EIB relations when the Bank decided to sign up to what would be its largest contribution to a single project outside the EU. The EIB is cooperating in financing the project with the Japanese Bank for International Cooperation, the Council of Europe Development Bank and the Republic of Turkey. More specifically, the Bank helped to finance this milestone transport link through the Bosphorus tunnel providing an urban commuter rail link, as well as a rail connection between Europe and Asia for InterCity and freight trains. The EIB can now look back on more than 45 years of lending activity in Turkey, which to date remains the largest recipient country of financing outside the EU.

Next station: Marmaray express

The Marmaray project still has a way to go before it will become operational as the historical findings came as a stumbling block. But knowledge of the history of Istanbul has been changed forever by this project. "In Istanbul we live on archaeology and we live in history," Huseyin Belkaya, Deputy Project Manager from Avrasyaconsult explains. "This tunnel will be built. Of course it will be a little bit delayed, but we have waited for around 147 years to construct this tunnel - we can wait a couple of years more."





 Print

Copyright © European Investment Bank 2012
The European Investment Bank is not responsible for the content of external internet sites.



http://www.eib.org/projects/news/bosphorus-tunnel-building-a-milestone-link-between-europe-and-asia.htm