EIRGRID EAST-WEST INTERCONNECTOR TEN-E
The EirGrid East-W Interconnector (EWIC) is an approximately 500MW capacity high-voltage direct current (“HVDC”) link from County Meath (IRL) to the Dee estuary on the north coast of Wales (UK). It has been designated as a priority interconnector.