, and public consultation. The EIS non-technical summary (NTS) has been provided to the Bank. Compliance with the SEA directive, the Water Framework Directive, climate change adaptation issues, the EIA
summary (NTS) has been provided to the Bank. The consent for port development, the Harbour Revision Order, was issued in May 2007. The Bank will review the EIA process, compliance with the SEA directive
of the European Union and/or which are subject to an Environmental Impact Assessment (EIA).
Non-Technical Summary (NTS) of the Environmental Impact Assessment (EIA) - for all projects for which an EIA is requested, the NTS is published, as they become available, on the website, or links where it can be consulted.
Activity List - list of signed loans.
Project Briefs - in case a project raises
Comunidad Autónoma de Castilla-La Mancha
The project consists of a 24 km by-pass in the city of Toledo.
The project is located in a convergence region, which will bring positive economic effects.
Transport
Compliance with EU environmental directives and national laws shall be ensured. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Procurement procedures applied by the promoter are in compliance with Council Directives applicable to public authorities’ procurement, and national legislation.
, and public consultation. The EIS non-technical summary (NTS) has been provided to the Bank. EIA procedures for the marine access channel deepening and widening works are underway. Compliance with the SEA
nor river flow parameters are expected to be modified by the project. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Non Technical Summary (NTS) of the Environmental Impact
Refinaria Alberto Pasqualini (REFAP). REFAP is owned by Petroleos Brasileiro S.A. and Repsol YPF Brasil S.A.
Technical and environmental upgrading of a refinery located in the State of Rio Grande do Sul.
The objective is to increase the production, improve the quality of fuels and reduce the emissions to air from the refinery.
Oil and Gas.
Industry
A formal environmental impact study was required by the Brazilian regulation. As outcome the environmental and construction permits were granted. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The procurement programme
An Environmental Impact Assessment (EIA) has been carried out. The Non-Technical Summary (NTS) of the EIA is available on http://www.puertocoruna.com/contenido/pags/Puerto_Exterior.htm
Compliant with EU Directives.
Namibia Power Corporation (Pty) Ltd (NamPower)
Construction of a 400 MWe, 1250 km transmission connection for reinforcing the electricity transmission interconnection between Zambia, Namibia and South Africa.
Export of hydro electricity, support of a competitive regional power market and improved security of supply.
Electricity
Energy
The project will comply with both national standards and international recommendations in the field of environment and the protection of nature conservation sites. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The Bank will require
in conformity with the requirements of the EIA directive.
Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The promoter is a private company not operating in the Utilities
directive. (link to NTS (non technical summary) will be added).
Procurement procedures followed and applicability of EU public procurement legislation will be verified during the appraisal.
Namibia Power Corporation (Pty) Ltd (NamPower)
Construction d'une ligne de transport de 400 MWe, d'une longueur de 1 250 km, destinée à renforcer l'interconnexion de transport d'électricité entre la Zambie, la Namibie et l'Afrique du Sud.
Exporter de l'électricité d'origine hydraulique, soutenir un marché électrique régional concurrentiel et améliorer la sécurité de l'approvisionnement.
Electricité.
Énergie
Le projet sera conforme aux normes nationales et aux recommandations internationales en matière d'environnement et de protection des réserves naturelles. Résumé Non Technique (NTS) de
authorities. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Contracts to be awarded will be subject to EU tendering procedures, with OJEU publication when necessary.
requirements for the project. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Procurement in line with EIB guidelines for private sector projects.
will ensure that national legislation and EU directives will be applied as regards environmental protection. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Promoter’s procurement
Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The project falls under the Directive 93/38/EC and its amendment 98/4/EC. The promoter has confirmed compliance with the respective
measures to the satisfaction of the Bank. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Public procurement rules and regulations do not apply to this private industry project.
. It will be verified during appraisal that the overall EIA process is in line with the EU acquis on Environmental Impact and in particular with regard to public consultation. Non Technical Summary (NTS
studies conducted. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The project is a private sector type operation with respect to the Bank’s Guide to Procurement. Shareholders
Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The Project was advertised in the Official Journal of the European Communities on 10 October 2002 (2002/S 197 – 155614). Four
has no significant environmental impact, complies with the Habitats and Birds Directives and does not have impact on Natura 2000 sites. Non Technical Summary (NTS) of the Environmental Impact Assessment
of the EIA will be assessed during appraisal. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The project is a private sector type operation with respect to the Bank’s Guide
Wastewater Treatment Plant in Dresden/Kaditz. Details will be assessed during appraisal. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The program falls under the Procurement
, an EIA represent up to 15% of total project cost. A copy of the Non-Technical Summary (NTS) of any investment requiring a formal EIA must be submitted to the Bank.
The promoter follows EU public
has been completed. Full details will be assessed during appraisal, including the Natura 2000 requirement. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Public procurement
, neither by the European EIA directive, nor by the national environmental authorities. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The promoter will comply with the Bank’s
with public consultation, which has already been undertaken. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The project will be procured as a Public Private Partnership
to the crossing of a Natura 2000 area (protection of rare birds) with respect to pipeline routing and timing and execution of construction works. Non Technical Summary (NTS) of the Environmental Impact
(79/409/EEC) and Habitats directive (92/43/EEC) are incorporated into Dutch law, through the “Natuurbeschermingswet”. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA
conservation sites (Natura 2000, Birds and Habitat Directive). Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Full permit application
The Bank will require the promoter to ensure
to the overall amelioration of the urban environment. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The Bank will require the Promoter to ensure that contracts
and is unlikely to have significant environmental impact. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The Bank will require the Promoter to ensure that contracts
has been initiated. Extensive environmental impact studies have wholly been carried out and a non-technical summary (NTS) is available at www.portofrotterdam.com . Extensive compensation measures have
network). Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Preliminary information provided to the Bank shows that the project is being implemented under a number of separate
Birds Directive (79/409/EEC) and Habitat Directives (92/43/EEC) and Natura 2000. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
TfL is an organisation that is subject to EU
The Abberton Scheme
Environmental Statement
Non-technical Summary
December 2007
NTS v3.indd 1 07/12/2007 16:28:32
The Abberton Scheme
Contents
What is proposed and what is the
purpose... of the Scheme?
Where can more information be found?
1.
2.
3.
4.
5.
6.
7.
1
6
8
10
18
20
25
NTS v3.indd 2 07/12/2007 16:29:14
Non-technical Summary
Following extensive environmental and engineering...
NTS v3.indd 3 07/12/2007 16:29:23
The Abberton Scheme
To meet the shortfall, NWL is proposing to implement the ‘Abberton Scheme’
(also referred to hereafter as ‘the Scheme’), which includes
Technical Summary Isle of Grain
JR4788B/Reports/ES Final NTS RPS Planning Transport & Environment
August 2003 RSK ENSR Environment Ltd
1
Non Technical Summary
Introduction
Grain LNG Ltd are proposing... Limited Additional LNG Storage Tanks at
Environmental Statement – Non Technical Summary Isle of Grain
JR4788B/Reports/ES Final NTS RPS Planning Transport & Environment
August 2003 RSK ENSR Environment... are required to convert the liquefied natural gas at minus 162oC to ‘normal’
natural gas at a temperature of 6oC for export to the National Transmission System (NTS);
the gas equivalent of the national grid
Service Centre
County Hall Town Hall
Beverley, Quay Road
HU17 9BA Bridlington, YO16 4LP
7266/CJB/NTS 1
1.5 As required by Section 17 of the 1999... :-
• The extension and development of the existing Caythorpe power
generation facility as an underground natural gas storage facility
7266/CJB/NTS 2
• The construction of a wellsite and the drilling of 6 boreholes to access
an identified underground gas-bearing geological structure
• The construction of a connection facility into the Transco National
Transmission System (NTS) together
ZNPP-Kakhovska - Draft Final NTS Report – July 2009
750 KV ZAPORIZKA – KAKHOVSKA
TRANSMISSION LINE AND 330 KV TL DIVERSIONS
PROJECT
(ZAPORIZHZHA OBLAST, KHERSON OBLAST)
DRAFT FINAL ESIA REPORT... AND SOCIAL MANAGEMENT AND MONITORING PLAN ........................... 18
MERCADOS EMI
Project No. P98267 Ukrenergo TL ZNPP-Kakhovska - Draft Final NTS Report – July 2009 NTS-1
FOREWORD
Note... may occur in the future. Any substantial changes will be
reflected in the final version of this Report.
This document provides a Non-Technical Summary (NTS) of the Environmental and
Social Impact
NACAP Lawrence Milford Haven to Aberdulais Pipeline
Environmental Statement
RSKENSR Environment Ltd
RSKENSR/HE/P40096/03/NTS Rev04
1
NON-TECHNICAL SUMMARY
1. INTRODUCTION
National Grid... owns and operates the
National Transmission System (NTS) and some of the Independent Distribution
Networks (IDNs) in Great Britain.
The NTS is a network of high pressure pipelines that carry gas from coastal terminals
to the main areas of demand within the UK. It comprises more than 6,700km of bulk
transmission steel pipelines that currently operate at up to 85bar g. The NTS also
includes
environmental policy. An EIA could be required under Annex 2 of Council Directive 97/11/EC regarding the transfer of water between basins. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA
Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The project is to be implemented through a negotiated extension to an existing concession contract signed in August 2004
(Directorate Environment, Nature and Energy). Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The project is being procured as a Public Private Partnership to design, build, finance
Summary (NTS) of the Environmental Impact Assessment (EIA)
The promoter is bound to follow EU public procurement procedures. The Bank will require the Promoter to ensure that contracts
(environmental consent) in December 2007 Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
[1]Only one pipeline representing 6% of the Gas System programme falls under
Directive where appropriate; all the relevant project’s key documents will be published in line with the Bank’s procedures. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA): http
que définie dans les directives « Oiseaux » (79/409/CEE) et « Habitats » (92/43/CEE) et les dispositions relatives à « Natura 2000 ». Résumé Non Technique (NTS) de l'Etude d'Impact sur
and non-technical summary (NTS) are available for inspection at
the Council Offices.
An electronic copy of the full ES (including the Planning Statement and NTS) can be
downloaded from... : james.townsend@your-energy.co.uk
Form and Content of the ES
The ES is presented in three main volumes, namely:
Volume 1 – Non Technical Summary (NTS)
The NTS presents a summary of the proposed development, its likely
Final Report
Skopje Bypass Republic of Macedonia
Revised Environmantal Impact
Assesment EIA-R
March 2006
PROJECT P0041667 FINAL REPORT MARCH 2006
NTS-EIAR.DOC 1
EXECUTIVE SUMMARY
ERM... to optimise the already shifted alignment (Alternative 2), adjustments
were therefore prepared by the Technical Planner for these two locations:
PROJECT P0041667 FINAL REPORT MARCH 2006
NTS... for local
traffic, farmers, pedestrians and bike riders will be possible using several
overpasses.
PROJECT P0041667 FINAL REPORT MARCH 2006
NTS-EIAR.DOC 3
The surface water drainage system
Terminal 2 Environmental Impact Statement
Volume 1 – Non Technical Summary
Ove Arup & Partners International Ltd
August 2006 NTS 1
NTS1. INTRODUCTION
Dublin Airport Authority plc (DAA... Statement
Volume 1 – Non Technical Summary
Ove Arup & Partners International Ltd
August 2006 NTS 2
NTS2. BACKGROUND TO THE PROJECT
NTS2.1 Need for the Terminal 2 Project
In 2001, following...
August 2006 NTS 3
NTS2.3 Development of the Proposed Scheme
A significant number of studies have been carried out in relation to masterplanning at Dublin
Airport in recent years. These studies
Easington to Ganstead Gas Pipeline
Environmental Statement
September 2006
[120750-0800-17_E2G ES NTS Draft (Peter Johnson review).doc
(i)
Document issue details:
B&V project no. Client...
September 2006
[120750-0800-17_E2G ES NTS Draft (Peter Johnson review).doc
(ii)
EASINGTON TO GANSTEAD GAS PIPELINE
ENVIRONMENTAL STATEMENT
CONTENTS
I INTRODUCTION I
II PURPOSE OF AN EIA... .
Figure 3.1 General Environmental Constraints
Murphy Pipelines Ltd
National Grid
Easington to Ganstead Gas Pipeline
Environmental Statement
September 2006
120750-0800-17_E2G ES NTS Draft
GLENKERIE WINDFARM
NON TECHNICAL SUMMARY
NOVERA ENERGY PLC NTS Page 1 of 12
INTRODUCTION
Novera Energy plc (Novera) proposes to
develop a small wind farm at Kingledores Farm
in the Scottish... of the
following impacts:
• Extremes in weather, with dry areas
becoming drier and wet areas wetter;
• Increased bouts of flooding;
GLENKERIE WINDFARM
NON TECHNICAL SUMMARY
NOVERA ENERGY PLC NTS Page 2... – Layout of proposed
Glenkerie Wind Farm
Site entrance
off A701
GLENKERIE WINDFARM
NON TECHNICAL SUMMARY
NOVERA ENERGY PLC NTS Page 3 of 12
Renewable energy has a key role to play in the
UK
ACHANY WIND FARM
ENVIRONMENTAL STATEMENT
VOLUME 1 – NON TECHNICAL SUMMARY
OCTOBER 2005
ACHANY WIND FARM ENVIRONMENTAL STATEMENT
NTS Page 1
NON-TECHNICAL SUMMARY
A INTRODUCTION... .
1 In addition there is a voluntary target of 20% reduction by 2010.
ACHANY WIND FARM ENVIRONMENTAL STATEMENT
NTS Page 2
Environmental factors have... STATEMENT
NTS Page 3
There are no aspects of the proposed wind farm development which are non-compliant with
national planning guidance and advice, or local planning policies or their aims.
F
-Technical Summary – December 2006
C7266/Addendum NTS final/ 291206/TLDP/CJB 1
1 INTRODUCTION
1.1 A planning application for the extension and development of the existing
Caythorpe power... . (The Addendum Non-Technical Summary can be found on the
following web site warwickenergy@btconnect.co.uk ).
C7266/Addendum NTS final/ 291206/TLDP/CJB 2
Please contact:-
R. Jones Esq.
Caythorpe... of Church
Lane and laid in the 66kV cable trench to a pole on the north side of the
B1253 opposite the PGF. The redundant poles would be removed from the
field to the east of the PGF.
C7266/Addendum NTS
to disbursement.
� For projects in the EU the Non Technical Summary (NTS) of the EIA is made
available on or via the EIB website.
� Outside the EU, the equivalent of the NTS along
was granted in March 2003. Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
The Promoter is a real estate/housing company, wholly owned by the City of Göteborg. It operates under
2008 0466 NTS Benesov-Strancice.doc 1/16
Optimization of the Benešov – Strančice railway section
The construction “Optimization of the track Benešov u Prahy – Strančice“ is one of a set... on the environment protection (monitoring,
protective measures, etc.). The building permit was issued by Railway Authority on 7.8.2006.
2008 0466 NTS Benesov-Strancice.doc 2/16
SCOPE AND SUBJECT... with fixed attachment
46 921 m
5 965 m
Rail switch establishment
UIC 60 new on concrete sleepers
S 49 new (used with priority)
30 pcs
26 pcs
2008 0466 NTS Benesov-Strancice.doc 3/16
to 4 and 2 in 2007 and
2006 respectively.
Publication of environmental information in the Project List
The Bank is committed to publishing the Non Technical Summary (NTS) when... requiring an EIA, out of 339 projects approved, the NTS of 68 were
published. The NTS of 13 were due for later publication. For 11 of these, EIAs are disbursement
conditions, while 2 were PPP projects
ESTUDIO DE IMPACTO AMBIENTAL
Modificación del Proyecto de Trazado del Metro de Bilbao
en el Área de Kabiezes y Nuevo Acceso a Mamariga
20080230 NTS Extension to
Kabiezes.DOC
Documento de... del Metro de Bilbao
en el Área de Kabiezes y Nuevo Acceso a Mamariga
20080230 NTS Extension to
Kabiezes.DOC
Documento de Síntesis del Estudio
de Impacto Ambiental 1
1. INTRODUCCIÓN
Este... Evaluación de Impacto Ambiental.
Modificación del Proyecto de Trazado del Metro de Bilbao
en el Área de Kabiezes y Nuevo Acceso a Mamariga
20080230 NTS Extension to
Kabiezes.DOC
Documento de
2008 0466 NTS Doubi-Tabor.doc 1/15
Modernization of the Track Veselí nad Lužnicí – Tábor, Part 1,
Doubí u Tábora Tábor Section
The construction “Modernization of the Track Veselí nad Lužnicí... track
parameters, making the line a double-track line, modernizing the construction and
2008 0466 NTS Doubi-Tabor.doc 2/15
technological parts and increasing the speed and reliability of railway... at station
new
reconstructed
1 x 220 m
2 x 350 m
1 x 350 m
Outer platform at station
new
1 x 220 m
1 x 60 m
2008 0466 NTS Doubi-Tabor.doc 3/15
Capacity data Project 2005
Outer platform at stop
Drummuir Estate Wind Farm
Volume I Amendment NTS
___________________________________________________________________________________________
2
PREFACE
This document is a Non Technical Summary... Location
Figure 2 Layout Plan
Figure 3 Photomontage and Wireline: View Looking North from Drummuir/Newburgh on B9115
Drummuir Estate Wind Farm
Volume I Amendment NTS... runs are avoided, as are exposed views along tracks.
Drummuir Estate Wind Farm
Volume I Amendment NTS
l'évaluation des incidences sur l'environnement (EIE).
Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)
Procédure négociée, certains lots faisant l'objet d'un appel à la concurrence
ETUDE DES RESEAUX DE TRANSPORT EN COMMUN DANS LE GRAND TUNIS
Résumé d'Etude d'Impact sur l'Environnement de la ligne D du RFR
FR-D-00-DS-C-STU-DAO-00000-1 page 2
20090154 NTS Ligne D1.doc... TRANSPORT EN COMMUN DANS LE GRAND TUNIS
Résumé d'Etude d'Impact sur l'Environnement de la ligne D du RFR
FR-D-00-DS-C-STU-DAO-00000-1 page 3
20090154 NTS Ligne D1.doc– Janvier -2009
RÉSUMÉ
1... RFR
FR-D-00-DS-C-STU-DAO-00000-1 page 4
20090154 NTS Ligne D1.doc– Janvier -2009
Une société responsable de l’édification des lignes, de l’exploitation et de la gestion future du réseau
est
DES RESEAUX DE TRANSPORT EN COMMUN DANS LE GRAND TUNIS
Résumé d'Etude d'Impact sur l'Environnement de la ligne E du RFR
FR-E-00-DS-C-STU-DAO-00000-1 page 2
20090154 NTS Ligne E1 (2).doc... COMMUN DANS LE GRAND TUNIS
Résumé d'Etude d'Impact sur l'Environnement de la ligne E du RFR
FR-E-00-DS-C-STU-DAO-00000-1 page 3
20090154 NTS Ligne E1 (2).doc– Janvier -2009
RÉSUMÉ
1... TRANSPORT EN COMMUN DANS LE GRAND TUNIS
Résumé d'Etude d'Impact sur l'Environnement de la ligne E du RFR
FR-E-00-DS-C-STU-DAO-00000-1 page 4
20090154 NTS Ligne E1 (2).doc– Janvier -2009
3.2.
On behalf of Lincs Wind Farm Limited
Non-Technical Summary
May 2010
LID6 Environmental Statement
Non-Technical Summary
Introduction
This document provides a Non-Technical Summary (NTS) of the Environmental Statement (ES)
produced as part of the consent application for the construction of six offshore wind turbines (the LID6)
off the Lincolnshire coast.
The NTS aims to provide an overview... cables. This NTS provides a description of the project, including
an overview of the reasons that new consent is being sought for these six turbines which have already
been consented via existing
have
decreased in 2009 compared to the previous year.
Publication of environmental information in the Project List
The Bank has committed to publishing the Non Technical Summary (NTS) when... , while 1 was a PPP project which requires publication
at a later stage2.
Even though in 2009 projects requiring an EIA have increased by some 40% timely publication
of the NTS on the Bank’s website
- i-
NON TECHNICAL SUMMARY
NTS
INTRODUCTION
1. Airtricity is proposing to build a windfarm in Upper Clydesdale. This involves construction of 173 wind
turbines and associated...
Commission Guidelines. This offers visual and landscape benefits from a number of key viewpoints and also
when moving along the M74 road corridor.
- ii -
CLYDE WINDFARM NTS... Preface for details of how to obtain this document.
- iii -
NON TECHNICAL SUMMARY
NTS
21. Due to increased government targets, Airtricity has made a conscious decision within the principles
been a call for international tender published in the
Official Journal of the European Union and/or which are subject to an Environmental
Impact Assessment (EIA).
• Non-Technical Summary (NTS) of the Environmental Impact Assessment (EIA) – for
all projects for which an EIA is requested, the NTS is published, as they become
available, on the website, or links where it can be consulted
........................................................................................... 69
3.6.5 GAS COMPRESSION AND CONDITIONING FACILITIES ..................... 69
3.6.6 CONNECTION WITH NTS... into a natural gas storage facility. This will involve the compression of
natural gas from the United Kingdom (UK) National Transmission System (NTS), re-
injection into the Baird gas reservoir, and subsequent re-supply of the gas to the NTS
from the Baird gas reservoir to meet market demand. This will reduce the UK’s
reliability on imported gas sources during periods of peak demand
1367/2006 and 1049/2001.
The “Access to Environmental Information” document only refers to NTS of the
EIAs and to “environmental studies” but mentions that the latter will be “available
only... the obligation
to disclose EIAs carried out by the promoter of the projects not only the NTS.
Third, there is no need to consult with the owner of the information before
disclosing the EIAs.
The Bank... on the website of the Bank.
For all projects requiring an EIA in the EU, the EIA
Directive requires the publication of the NTS
therefore it is also available on the Bank website.
Outside the EU
Summary
The non technical summary (NTS) presents a summary of the Proposal, its likely
environmental impacts and proposed mitigation.
Volume 2 – Written Statement main text
The written statement... George Street
London
W1U 7DY
Tel: 020 7563 4747
Fax: 027 7563 4748
Email: info@your-energy.co.uk
4
Introduction
1. The non technical summary (NTS) presents a summary of the Proposal, its likely
environmental impacts and proposed mitigation. This NTS forms part of an
Environmental Statement (ES) which has been prepared in accordance with the
requirements of the Town
, EDF 1984, technical study of the rehab ilitation of the Inga plants, Fichtner 2005)
and through the acquisition o f new data.
A number of docume nts defining the major outlines of the project have... assessment fr a me work:
• The Social and Environmental Management Framework (SEMF) describes the
pro ject at the level of the different compone nts and sub-componen ts. It provides
information... the displacemen t and/or compensation of persons is inevita ble. It fixes the
rules by which these displace me nts will have to be carried out. The resettle men t
framewo rk makes a comparative analysis of th e
.
The gas has to be dried before export to the National Transmission System (NTS), this is
typically done by molecular sieve adsorption columns. The regeneration system for the
dryers will include gas... , these will be appropriately painted and screened to minimise their visual impact.
S.16 An underground pipeline will be installed to connect the Gas Compressor Station to the
NTS that runs adjacent to King Street.
Gas Connection Compound
S.17 At the NTS connection point, a small above ground installation approximately 25m by 25m is
required for pigging and control equipment. The siting of this will depend
This document provides a Non-Technical Summary (NTS) of the Environmental and Social
Impact Assessment Report (ESIA) of the Black Sea Regional Power Transmission Project in
the Republic of Georgia... and of the how the project could affect the
environment and people. In addition, the NTS describes what actions have to be taken to
reduce the effects on the environment or people.
This NTS is part of the larger package of documents, including the ESIA and the Public
Consultation and Disclosure Plan (PCDP). The ESIA, PCDP and NTS will be publicly
available in English and Georgian after May 10th
of environmental information in the Project List
The Bank is committed to publishing the Non-Technical Summary (NTS) when Environmental
Impact Assessment (EIA) information is required for a project. The first... on the
web due to reasons of confidentiality and 1 project was cancelled. Finally, for 1 project, which
was approved in December 2007, the NTS has not yet been published.
Other commitments
Some
committed itself to publish the Non-Technical Summary (NTS) when an
Environmental Impact Assessment (EIA) is required for a project. The detailed breakdown
about the publication of EIA information can... 2
EIA as
disbursement
condition
11 17 11
From a total of 93 projects that required an EIA in 2010, the NTS of 82 projects were
published.
In general, for some projects the environmental
No
tificati
on
t
o
ap
p
li
ca
nts of
ou
tcome
of
Sta
ge
1
1
5
Oct
ob
er
20
1
0
De
adli
ne fo
r s
ub
mis
sion
of
Stage
2 O
ffer
s
10
Dece
mber
20
1
0
No
tificati
on
t
o
ap
p
li
ca
nts of outcome of Stage 2 Offers
Mid
-
Ja
nu
ar
y
2011
Start of negotiations on
Operational Agreements
Mid-February
2011
STAGE 1 – Expression of Interest
Provide a declaration of your
is a non-technical summary (NTS) of the Lincs Offshore Wind Farm
Environmental Statement.
It aims to provide an overview of the key findings of the Environmental Impact
Assessment (EIA) undertaken by Centrica as it seeks consent for the proposed
Lincs Offshore Wind Farm 8 km off the Lincolnshire coast. This NTS provides the
project details, onshore and offshore, including details of the scientific... in 2002 for further development of
offshore wind farms.
The ES comprises four components; the NTS, Volume 1 (Offshore), Volume 2
(Onshore) and associated Technical Appendices.
The offshore works
of constru ction to be empl oyed will be determined by the successful
Tender but will be subjec t to th e conditions imp osed by this EIS, t h e contract
documents and any other statutory r equireme nts... .
The construction of embankme nts and cuttings will require the transportati on of
large volumes of earth wi thi n the landtake corridor. The transportati on will be via
tempor ary ha ul roads constructed... posed re alignme nt prese nts a net posi tive socio - economic impa ct
by reducing c ong estion, b y providing f aster and more conve nient access to and
from business centres, and by e nhancing the l
or negative, that the scheme might have on the local environment. This document
is a non-technical summary (NTS) of the ES. The purpose of an NTS is to provide an overview,
in non-technical language
LNG TERMINAL PROJECT
Świnoujście, Poland
NON TECHNICAL SUMMARY
(NTS)
November 2010
LNG TERMINAL IN ŚWINOUJŚCIE , POLAND NOVEMBER 2010
i NON-TECHNICAL SUMMARY...
LNG TERMINAL IN ŚWINOUJŚCIE , POLAND NOVEMBER 2010
1 NON-TECHNICAL SUMMARY
1 INTRODUCTION
This document is the Non Technical Summary (NTS) of the independent assessment... supporting documents and related key permit documents. The NTS is
presented published in a form and language that is understandable for the non-expert and
general public. References are made to the other
for hard copy or free on CD), or additional copies of
this NTS (free) can be obtained from DONG Energy. A downloadable version of the
NTS, plus other information on the project, can be obtained
Ethylene Glycol
MMO Marine Mammal Observers
MLWM Mean Low Watermark
NaCl Sodium Chloride
NTS Non-Technical Summary
NUI Normally Unmanned Installation
OBM Oil Based Mud
OCNS Offshore Chemical... will operate in two modes, namely injection and production. Gas will be
taken mainly from the National Transmission System (NTS) during periods of low demand,
compressed and sent for storage in the offshore reservoir via a subsea pipeline. During periods
of high demand, gas is returned from the offshore reservoir via the same subsea pipeline. Once
ashore, the gas is conditioned to meet NTS
VolumeIII
Rapport statistique
Rapport annuel 2004
GroupeBanqueeuropéenned’investissement
Rapport statistique 20041
Chiff res clés du GroupeBEI
Banqueeuropéenned’investissement
Activitéen 2004
(enmillions d’euros)
Prêts signés43 204
Union européenn 39 661
Pays partenaires3543
Prêts approuvé 45 780
...
and operator of the UK’s gas transmission network, the National Transmission System
(NTS) and the regulated owner and operator of around 50% of the UK’s gas distribution infrastructure, the Local... a process
called “vaporisation”). It is then fed into the existing high pressure natural gas
pipeline that connects the LNG process plant to the UK gas National
Transmission System (NTS). The NTS
SEIA – Fauji Cement Company Limited - Capacity Enhancement
ECTECH - Environment Consultants
Page – i
NTS of EIA for Fauji cement, carried out in March/April/May
2007.
Executive Summary
SEIA – Fauji Cement Company Limited - Capacity Enhancement
ECTECH - Environment Consultants
Page – ii
EXECUTIVE SUMMARY
ECTECH Environmental Consultants have been awarded the contract by Fauji
Cement Company Limited (FCCL) to prepare Social and Environmental Impact
Assessment (SEIA) report of 7,200 tonnes per day of cement Capacity
Enhancement Project at existing cement manufacturing
Council.
Further copies of the NTS, and copies of the ES can be obtained from the
address below. The NTS is available free of charge, whilst the full ES can be
purchased on CD at a price of €10... Heritage
Hydrology
Noise
Traffic
Telecommunications
Shadow Flicker
All these topics are covered in detail within the full ES.
New Contents
This 2008 Non Technical Summary (NTS) and ES replaces the 2007 NTS and
ES which included the results of a number of new avian assessments included
within the 2006 version of the extension application (Winter Waterfowl survey
and Hen Harrier
Delivering sustainable solutions in a more competitive world
Environmental and Social
Impact Assessment for the
Eurasia Tunnel Project
Istanbul, Turkey
Volume I
Non Technical Summary (NTS)
Final Draft
January 2011
ERM Group, Germany and UK
ELC-Group, Istanbul
ELC Group Ltd.
Kavacık Mah. Şehit Mustafa
Yazıcı Sok. No:20
KAVACIK/ ISTANBUL
(+9)0 216... and Investment Inc. Co.)
Eurasia Tunnel Environmental
and Social Impact Assessment
Volume I
Non Technical Summary (NTS)
Final Draft
January 2011
DRAFT REPORT
ERM GmbH
Environmental
Resources
amenagement de verdure plus idylliqiic.
Lès ccrvine^s co.T.muns construits entre les bâtirï.c-nts de burea-ux
(et cvcjitueller;-,ont plus tard sous leur extension) sont en principe à 1 e\ir
jiuitc... exclusive des élémic;nts ,
construits pour un effectif de .500 personnes (1ère étape), alors que les
éléments d ' e;-;tcnsion nécessaires au stade de développcii.cnt final d'au
moins 1.500 personnes
Aménagement de six zones industrielles, construction de deux bâtiments pour des petites entreprises et de deux autres pour un collège technique; amélioration du bâtiment du Musée des transports routiers et aménageme nts routiers, intéresant l'aggl
’s due
diligence process. The EIA should be completed and its main findings and recommendations must
satisfy the requirements of the Bank prior to disbursement. Outside the EU, the NTS of the EIA
) of the proposed new Acute Hospital for
the Forth Valley area located at the former Royal Scottish National Hospital (RSNH) site in Larbert. This
is the Non Technical Summary (NTS) of the Environmental