socios.
EIB / EU Risk Sharing Finance Facility (RSFF): Policy, Sectors, Instruments and
Partners
Thomas Barrett
BEI, Director del Departamento AGI “Iniciativa de Acción para el Crecimiento” /
Director of Action for Growth Initiative (AGI) Department
Kim Kreilgaard
BEI, División de I+D+i del Departamento AGI / AGI RDI division
11:30 Turno de preguntas / Q&A session
2
DrainBarmston DrainBarmston DrainBarmston DrainBarmston DrainBarmston DrainBarmston DrainBarmston Drain River HullRiver HullRiver HullRiver HullRiver HullRiver HullRiver HullRiver HullRiver Hull
Ganstead AGI
Asselby AGI
lead to prosecution or civil proceeding Licence Number ES100018275
This map is reproduced from the OS map by National Grid Transco with
Copyright. Unauthorised reproduction infringes Crown
s'appuie sur une collaboration de longue date entre les deux institutions. Jusqu'à présent, il s'est principalement agi de soutenir des investissements réalisés par des petites et moyennes entreprises. Les
(Smedjan Room)
Topics
Moderator and speaker
Christopher Knowles, Associate Director, Energy & Environment, Structured Finance & Advisory/AGI-EU, EIB
12:45 Lunch
Mme Marta Gajęcka vient d’être nommée vice-présidente de la Banque européenne d’investissement et prendra ses fonctions le 16 août 2007. Elle succédera à M. Ivan Pilip, qui vient d’achever son mandat de trois ans et qui aura été le premier vice-président issu de l’un des États ayant adhéré à l’Union européenne depuis le 1er mai 2004. De nationalité polonaise, Mme Gajęcka a été nommée par le Conseil des gouverneurs de la BEI sur proposition de la République de Pologne, laquelle a agi en accord avec les autres membres du groupe électoral auquel elle appartient, à savoir la Bulgarie, la
4 octobre prochain.
" Nous avons agi rapidement pour mettre en œuvre le plan d'action conjoint et nous comptons maintenant dépasser notre objectif de 11 milliards d'EUR , a indiqué M. Maystadt. À ce
Installation (AGI), a small scale
connection facility located on the south side of Woldgate, close to the
Rudston AGI.
6.4 Predicted Landscape Impacts
Construction, Drilling and Testing Phases
6.4.1... . Impacts on landscape character would not be
significant.
6.4.6 Impacts would also occur due to the creation of the proposed Woldgate AGI
within an undeveloped open agricultural field located adjacent... to integrate the AGI within its wider
setting. Impacts on landscape character are predicted to be of low-medium
magnitude and moderate-slight significance. These would not represent a
‘significant
)
• Cayetano Roca, Director General, Sociedad Estatal de Infraestructuras
del Transporte Terrestre S. A. (SEITTSA)
• Thomas Barrett, Director AGI, Banco Europeo de Inversiones (BEI)
Seminario III
at the Herbrandston LNG terminal and then pick up
natural gas from the second LNG terminal before continuing first northwards, then
eastwards across South Wales to connect to the NTS adjacent to an existing AGI...
RSKENSR/HE/P40096/03/NTS Rev04
2
Associated Facilities
At the two LNG sites, new AGIs will be built to connect the pipeline to the terminals.
At the Herbrandston LNG terminal the new AGI (called the Herbrandston AGI) will
comprise a “pig trap”, which is a facility to launch and receive devices (called pipeline
internal gauges or “pigs”) to inspect the new pipeline. The site will also
and management conditions no. AGI/UA-II-7331/1/2004
4. Draft map
5. Location plan for Goświnowice Ethanol Production Plant
Appendices (air)
2/1 Current air quality
2/2 Wind rose
2/3 Calculation data
gas from the existing Ganstead (TA 136.368) Above Ground Installation
(AGI) to an existing AGI at Asselby (SE 700.272). The whole pipeline runs within the East
Riding of Yorkshire Unitary Authority... through mainly agricultural land; starting
at Ganstead AGI, North of the Humber, then Westwards between Beverley and Hull
continuing parallel to the A63 highway (which turns into the M62) and finishing at the
Asselby AGI which lies near the River Ouse upstream of Goole (see Figure 1). Site
extensions will be required at the AGIs to accommodate the new pipework associated with the
pipeline
INSTALLATION
2.1 Amendments to the PGF
2.1.1 The amendments relate only to the Power Generation Facility (PGF) and not
to the Carr Plantation Wellsite, the Woldgate Above Ground Installation
(AGI... features (in particular
two bulky compressor houses), together with the creation of a wellsite
platform close to Carr Plantation and the Woldgate AGI.
5.4 Careful design and siting within compact
terminal (AGI) at Mappowder
• A block valve station (BVS) near Osmington
• Associated temporary pipe storage areas and
contractors' temporary facilities at the Mappowder
AGI, Bourne Park and near...
pipeline and a leaching building to enable
cavern construction
A gas pipeline terminal AGI
A gas compressor building
An electricity generator building for on-site
power generation
A brine station... for the proposed infrastructure sites to be at risk
of flooding have been considered and consultations with
the Environment Agency have taken place. The
Mappowder AGI, brine wellsite, block valve site
) and
Ganstead (NGR 516250, 436500), in East Yorkshire
(see Figure 1.) Figure 1.1 shows the pipeline route,
which runs entirely within East Riding of Yorkshire.
From Easington AGI, north... Grange, turn north
passing the south and west sides of Sproatley, pass
over Thirtleby and terminate at the Ganstead AGI which lies to the North and east of Ganstead.
Murphy Pipelines Limited has...
advice or assistance on any problems that may
arise. Five potentially contaminated sites are
crossed by the pipeline, two of which are AGI’s,
but a site investigation and subsequent
conformance
Ground Installation (AGI) at Harefield to an
existing AGI in Southall. The pipeline
originates at the proposed Hill End AGI and
goes in a south-easterly direction between Mad
Bess Wood and Bayhurst
bei der EIB – eine
neue produktbasierte Hauptabteilung (Action
for Growth Instruments/AGI – Instrumente zur
Unterstützung der Aktion für Wachstum) mit
Zuständigkeit für strukturierte... entwickelt wurde.
Die Hauptabteilung AGI unter der Leitung von
Thomas Barrett wird in erster Linie für die Über-
nahme höherer Risiken durch den Einsatz der
Fazilität für Strukturierte Finanzierungen (FSF)
verantwortlich sein. Die AGI wird die Gesamtver-
antwortung für sämtliche Aktivitäten im Rahmen
der FSF tragen, die TEN-Vorhaben im Verkehrs-
und im Energiesektor betreffen. Das Gleiche
.
The revised organisation consists of six
(previously eight) geographic lending de-
partments and, for the first time at the EIB,
a new product-based department (AGI/Ac-
tion for Growth Instruments... -fertilisation and inte-
gration already developed under the pre-
vious structure established in time for the
2004 EU enlargement.
The AGI Department, headed by Thomas
Barrett, will in particular be responsible for
higher risk-taking through the use of the
Bank’s Structured Finance Facility (SFF).
AGI will have overall responsibility for all
SFF activity relating to transport and en-
ergy
and corridors 1993-
2005
APPENDIX 3: Map of Motorways of the Sea
GLOSSARY
GLOSSARY OF TERMS AND ABBREVIATIONS
AGI Action for Growth Instruments
ASAP Amsterdam Special Action Programme... for the EIB. The Bank was actively
involved in the preparation of the European Action for Growth (AGI) initiative (2003), which has
induced changes in its organisational structure and defined TENs as a main... was an
important EIB priority. More recently (2003), the EIB was actively involved in the preparation of the
European Action for Growth (AGI) Initiative. The importance attached by the Bank to AGI has led
an additional
internal control of the loan portfolio.
The Action for Growth Instruments (AGI) Department has been renamed the New Products &
Special Transactions Department (NPST) and put in charge
pourtant, où pourrais-je mieux le dire que dans
cette enceinte et aux parlementaires de l'Europe que vous
êtes ? La France, pour son coepte, mais je ne m'exprime pas
en son nom, a agi. Elle le devait... derniers siècles d'un
des peuples d'Europe, des Etats européens n'a gas agi de la
même façon ? Les renversements d^alliance ont été la preuve
la plus évidente de la fidélité à soi-même. Est-ce que nous
).
Internally, this is complemented by the creation as of January 2006 of a horizontal
department (AGI, Action for Growth Instruments), which follows EPEC, provides PPP
support to the geographical lending
GLOSSARY
GLOSSARY OF TERMS AND ABBREVIATIONS
AGI Action for Growth Instruments
ASAP Amsterdam Special Action Programme
Borrower The legal persona with whom the Bank signs
Table V.17 AGI Stations on Seyhan River ...........................................................................157
Table V.22 The number and duties of the personnel that will work during
Newlands Cross Upgrade EIS
December 2007
South Dublin
County Council
Kildare
County Council
South Dublin County Council
N7 Newlands Cross Upgrade
Environmental Impact Statement
December 2007
Arup Consulting Engineers
50 Ringse...
EVALUIERUNG DER OPERATIONEN
ZUSAMMENFASSENDER BERICHT 2005
Geleitwort des Präsidenten
Der vorliegende Überblick für das Jahr 2005 ist ein neuer Bericht, der von der Abteilung
Evaluierung der Operationen, die jetzt Teil der unabhängigen Hauptabteilung General-
inspektion ist, erstellt wurde. Er ...
ABKÜRZUNGEN
AGI Action for Growth Instruments – Instrumente zur Unterstützung der Aktion
für Wachstum
ASAP Amsterdam Sonderaktionsprogramm
BIP Bruttoinlandsprodukt.
bp basis points - Basispunkte
trafic "fret" (2,6 km).
Dans le cadre de l'élaboration de l'étude d'impact, il s'est agi d'une part
d'actualiser les données environnementales collectées et analysées lors des études
d'APS et d'autre
Nuovo fondo carbonio in programma per la BEI e la KfW p.5 • La BEI lancia i fondi di sviluppo urbano in Polonia e in Spagna p.11 • Accor-
do-quadro BEI-ABI-Confindustria per sostenere le PMI e la RSI in Italia p.13 • Primo prestito diretto all’energia rinnovabile e all’efficienza
energetica in...
den für das
vorrangige Darlehen und den für das LGTT
zuständigen Dienststellen (Finanzierungs-
operationen in Portugal bzw. AGI, Aktion für
Wachstum) der Bank zu verdanken.
Der Standort des
privilegiato
(ESPT-3 – Operazioni di finanziamento in Por-
togallo) e quelli preposti all’LGTT (AGI – Stru-
menti per l’Azione a favore della crescita).
Daniela Sacchi-Cremmer
Dipartimento Comunicazione
Il
pays candidats) de la BEI
Ops A-AGI Département Instruments de l’Action pour la croissance de la direction des financements en Europe de la BEI
PCR Project Completion Report
PE Parlement européen
significativement moins
rigoureux que ceux utilisés dans le cadre des autres évaluations d'EV. On a agi de la sorte : (a) pour
tenir compte des avantages externes des projets ferroviaires, qui sont
Rapport d’évaluation
Département d’évaluation des opérations (EV)
Évaluation de projets réalisés
dans le secteur des transports en
Europe centrale et orientale
Rapport d’évaluation
Évaluation ...
significatifs. En outre, d’une manière générale,
l’impact direct de ces projets sur l’emploi, bien qu’il ne se soit pas agi d’un critère
fondamental de sélection, a été réduit. L’étude des répercussions ind
Rapport d’évaluation
Évaluation des opérations (EV)
Évaluation des projets de
type PPP financés par la
BEI
Rapport de synthèse
Évaluation des projets de type PPP financés par
la BEI
Établi par
Évaluation des opérations
Campbell Thoms...
Rapport d’évaluation
Évaluation des opérations (EV)
Évaluation des prêts globaux
consacrés aux PME dans l’Union
élargie
Rapport de synthèse
Évaluation des prêts globaux consacrés aux PME
dans l’Union élargie
Rapport ét...
Rapport d’évaluation
Évaluation des opérations (EV)
Évaluation des projets
financés par la BEI dans le
secteur des infrastructures
aéroportuaires
Rapport de synthèse
RAPPORT D’ÉVALUATION
Évaluation des pro...
s’est agi de faire
la promotion des lignes de crédit destinées
aux PME. Il n’est donc pas surprenant qu’el
les aient répondu massivement à l’invitation
de la Banque à participer à une table
-
stiti a favore di quei progetti e promotori che, pur
avendo un rating inferiore all’investment grade, agi-
scono da stimolo per gli investimenti in tecnologie
d’importanza cruciale per l’economia
Les RAILPAG visent à fournir un cadre commun pour l’évaluation des projets ferroviaires dans l’ensemble de l’UE.
Ces orientations ont été élaborées à la suite d’une initiative de la Banque européenne d’investissement, avec l’appui
de la Commission européenne (DGTREN), d’institutions financières...
). The peaking generation capacity
is fired on distillate only.
There is a gas connection to the site through the Bórd Gáis above ground installation (AGI)
located east of the upper portion
E u r o p ä i s c h e I n v e s t i t i o n s b a n k - G r u p p e
Teil II
Finanzbericht
Jahresbericht 2006
Der Jahresbericht 2006 der EIB-Gruppe besteht aus drei getrennten Teilen:
- Tätigkeitsbericht: Darstellung der Tätigkeit der EIB-Gruppe im abgelaufenen Jahr sowie der künftigen Perspektiv...
RBpublique du Benin RBpublique Togolaise
+s
II
COMMUNAUTE ELECTRIQUE DU BENIN
E2053
VOL. 1
(CEB) FRENCH
E FOURNITURE DE SERVICE D'ENERGIE
[PFSEI .,, ,
- \4
1,
-4- - .P: @
nsrdd -- WE 161 kU ONIGBOLO-PARAKOU
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure A...