Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20161019
    Date de publication: 19 avril 2017

    Promoteur – Intermédiaire Financier

    STROMNETZ HAMBURG GMBH

    Lieu

    Description

    Modernisation of the city of Hamburg's municipal electricity distribution network in the years 2017-2021.

    Objectifs

    The project comprises a multi-annual investment programme in the electricity distribution network of the city of Hamburg. The project includes the refurbishment and restructuring of ageing high, medium and low voltage network infrastructure, connecting infrastructure for embedded renewable energy sources (RES), small-scale combined heat and power systems (CHPs), an electric city bus network and smart grid infrastructure (remote control functionality, smart meters).

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 220 million

    Coût total (montant approximatif)

    EUR 485 million

    Aspects environnementaux

    The project includes facilities that fall under Annex II of the EIA Directive (2011/92/EU), which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected for some schemes relate to visual impact, impact on flying vertebrates, electromagnetic fields, noise nuisance and disturbances during construction. The appraisal will focus on the promoter's environmental capacity and work procedures.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directives 89/665/EEC and/or 92/13/EEC as amended by Directive 2007/66/EC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 30/09/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Énergie