    Référence: 20161011
    Date de publication: 16 mai 2017

    Promoteur – Intermédiaire Financier

    City of Vienna – Wiener Wohnen

    Lieu

    Description

    Refurbishing of social housing throughout the entire urban area in Vienna, thus upgrading energy efficiency standards

    Objectifs

    (i) Enhanced living standards and health conditions for tenants, (ii) urban renewal and regeneration of the concerned areas, (iii) better social inclusion of low-income tenants and (iv) reduction in energy consumption of the housing stock.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 150 million

    Coût total (montant approximatif)

    EUR 364 million

    Aspects environnementaux

    Austria, as an EU Member State, has harmonised its environmental legislation in line with the relevant EU directives (Directive 2011/92/EU and 2001/42/EC). However, given the nature, scale and location of the sub-projects – upgrading and rehabilitation of social housing and associated social and urban infrastructure in built-up urban areas – there is no need for an environmental impact assessment (EIA) as defined in the EIA Directive 85/337/EEC and subsequent revisions. Compliance with the EU Directive on the energy performance of buildings (recast) (2010/31/EU) will be further examined during appraisal.

    Passation des marchés

    The Bank will require the promoter, as a public administration entity, to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where appropriate.

    Statut

    Signé - 25/07/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Autriche Aménagement urbain