    Référence: 20130099
    Date de publication: 14 juin 2013

    Promoteur – Intermédiaire Financier

    ELECTRICITY SUPPLY BOARD

    Lieu

    Description

    Construction of five new substations and the related cabelling work to enable renewable energy connection to the grid in the South-West of Ireland.

    Objectifs

    Construction of five power substations and associated network connections in South West Ireland. The substations are aimed at directing renewable generated power, mainly wind, from the 110 kV network to the 220 kV network.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 429 million

    Aspects environnementaux

    By their technical characteristics some project components fall under Annex II of the Environmental Impact Assessment (EIA) Directive. According to the decisions made by the Irish competent authorities, none of them requires Statutory Environmental Impact Assessment. Environmental Studies have however been carried out to support the relevant planning applications and mitigating and/or compensation measures will be applied as necessary. The impacts that can be typically expected for the project relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance and disturbance during construction.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/17/EC/ and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 9/12/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).