Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100281
    Date de publication: 22 octobre 2014

    Promoteur – Intermédiaire Financier

    REPUBLIC OF LEBANON - COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION

    Lieu

    Description

    Expansion of the existing wastewater preliminary treatment plant, located in Southern Beirut, and its conversion into a primary treatment plant and construction and upgrade of sewer networks in the catchment area.

    Objectifs

    The project will improve the poor quality of the coastal water and, through the provision of improved sanitation services, the quality of life for an estimated one million inhabitants (a quarter of the Lebanese population) and will reduce pollution and environmental stress in the Al Ghadir drainage area and the Mediterranean Sea.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Garantie au titre du MPE

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Montant BEI envisagé (montant approximatif)

    EUR 68 million

    Coût total (montant approximatif)

    EUR 146 million

    Aspects environnementaux

    The project will generally benefit the environment and public health by providing sanitation to a population of around one million inhabitants (a quarter of the Lebanese population), and by collecting and treating waste water before discharging it into the Mediterranean Sea. It will therefore reduce pollution of beaches and coastal waters within the Al Ghadir drainage area south of Beirut as well as of the Mediterranean Sea. An environmental and social impact assessment has been approved by the competent authority, the Ministry of Environment. The Bank will review during appraisal its compliance with the Bank's environmental and social safeguards and applicable national and international standards.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 28/02/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Liban Eau, assainissement