Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20070403
    Date de publication: 8 juillet 2008

    Promoteur – Intermédiaire Financier

    Compania de Apa Somes S.A.
    Regional operating company for water and wastewater services in Cluj and Salaj counties.

    Lieu

    Description

    Co-financing of the investment project for expansion and rehabilitation of the water and waste water networks, construction and refurbishment of pumping stations and treatment facilities for water and wastewater. The project is part of the Priority Axis 1 of the Romanian Sector Operational Programme for Environment (SOP ENV), supported by Cohesion Funds, with end of implementation expected by 2013.

    Objectifs

    The project aims toimprove public health and environment protection in the region comprising the counties Cluj and Salaj in Romania, by upgrading the essential water and wastewater infrastructure. The investments affect a population of around 520.000 inhabitants.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 26 million.

    Coût total (montant approximatif)

    EUR 196.9 million.

    Aspects environnementaux

    The project has an overall positive environmental impact. As a project benefiting of EU cohesion funding, evidence will be sought providing that environmental, nature conservation and other analogous requirements are properly addressed, specifically compliance with regard to EIA procedures (EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC).

    Passation des marchés

    The promoter is a publicly owned entity providing a public utility service and is subject to EU public procurement regulations (Directive 2004/17/CEE for utilities) as mirrored in the national public procurement regulations. The Bank will require the promoter to ensure that the contracts under the project shall be tendered in accordance with these regulations.

    Statut

    Signé - 22/07/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Eau, assainissement