Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20100515
    Release date: 9 February 2011

    Promoter – Financial Intermediary

    The General Directorate of State Railways Administration (TCDD)
    Mr. Mehmet TURŞAK
    Head of Research Planning & Coordination Department
    Talatpasa Bulvari 06330 Gar- Ankara Turkey
    Tel : +90 312 311 25 66
    Mobile : +90 505 467 03 44
    Fax : +90 312 310 40 84
    www.tcdd.gov.tr

    Location

    Description

    The rehabilitation of the Irmak-Zonguldak railway line which connects several ports on the Black Sea with Anatolia, particularly the capital Ankara.

    Objectives

    To shift mainly freight road transportation to railways in order to alleviate the imbalance among transport modes, hence decreasing environmental repercussions of road transport and increasing safety.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 145 million

    Total cost (Approximate amount)

    EUR 370 million

    Environmental aspects

    The Project is aimed at rehabilitating and implementing a signalisation system for the 486 km Irmak - Karabük – Zonguldak Railway Line. The Project includes the complete renovation of the permanent way, substructure, bridges and culverts, the introduction of new telecommunication and signalling systems and changes to the track layout in some selected stations. Being a rehabilitation of a line along the existing alignment with no changes of the location of the permanent way, the project is expected to fall under Annex II of the relevant EC Directive and applicable Turkish legislation.

    Procurement

    This is a project co-financed with IPA funds from the EC. Procurement of the works will be done in line with the relevant EC Directives and EIB Guide to procurement.

    Status

    Signed - 4/07/2011

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Turkey Transport