corporate_banner_en

Tenke Fungurume Mining project, Democratic Republic of Congo (DRC)

The blog
Press corner
All press releases
All other news
Press contacts
Events
All events
Business events
Institutional events
Newsletter
Publications
All publications
General
Reports
Information
Human resources
Strategies & procedures
Thematic
Geographical
Technical studies
Ex-post evaluation
Capital markets
Economic research
Ordering a publication
The historical archives of the EIB
EFSI Scoreboards
Help
Search criteria - General principles
How to search in the register
Result page
Latest documents
Basic search
Public register
Latest documents
Basic search
Frequently asked questions
Help
Search criteria - General principles
How to search in the register
Result page
Request a document
Other public registers
Picture library
News in pictures
Management Committee's Photos
Werner Hoyer
Dario Scannapieco
Jonathan Taylor
Ambroise Fayolle
Andrew McDowell
Vazil Hudák
Alexander Stubb
Emma Navarro
The EIB services
Building
Archives
Former Presidents
Former Vice-presidents
from left to right: Mustafa Abdel-Wadood, CEO,Abraaj Capital Limited, Philippe de Fontaine Vive Curtaz,Vice President, EIB and H.E. Eng. Yarub Qudah, CEO of JEDCO
Greater Manchester Metrolink extension
Mr Olaf Scholz, Mayor of Hamburg
Fritz Vahrenholt, Chief Executive Officer, RWE Innogy GmbH, Germany, Karina Veum, Senior Researcher, Energy Research Centre of the Netherlands, Alistair Buchanan, Group Chief Executive, OFGEM, UK regulator of gas and electricity markets and Frauke Thies, EU Energy Policy Coordinator, Greenpeace
Mr Matthias Kollatz-Ahnen, Vice-President of the EIB
from left to right:Jörg Vogt, CFO, Trianel, Germany (Project: Borkum West II Offshore Wind Park), Pierre Lestienne, CFO, C-Power, Belgium (Project: C-Power near Ostend) and Georg Friedrichs, Vice-President, Head of Offshore Wind Projects, Vattenfall, Germany (Project: Thanet Offshore Wind Farm)
from left to right: Mr Kevin Smith, Director Wind Energy, Det Norske Veritas, Norway, Mr Frank V.Nielsen; Chief Technology Officer, LM Wind Power, Denmark and Mr Konstantin Staschus, Secretary General, European Network of Transmission System Operations for Electricity (ENTSO-E)
from left to right: Mr Rober Harrabin, Environmental Analyst, BBC and Mr Hans-Jörg Bullinger, President, Fraunhofer-Gesellschaft of Germany
Mr Paulo Roberto de Oliveira Araujo, Head of Department, BNDES International Division, Mr F. de Paula Coelho, Director of the ALA Department of the EIB and Mr Christophe Nègre, Deputy Head of Division, Legal Department of the EIB
From left to right: Mr. de Paula Coelho, Director of the Asia Latin America Department and Mr Paulo Roberto de Oliveira Araujo, Head of Department, BNDES International Division
From left to right: Mr. de Paula Coelho, Director of the Asia Latin America Department of the EIB and Mr Paulo Roberto de Oliveira Araujo, Head of Department, BNDES International Division
Mr Paulo Roberto de Oliveira Araujo, Head of Department, BNDES International Division
Group picture of the signature Brazil Climate Change Mitigation
Picture of all the participants at the signature EFL loan for SMEs and Mid-Caps III
FROM LEFT TO RIGHT: Mr ANDRZEJ KRZEMINSKI President of the Management Board- EFL and Mrs FÜRSTENBERG-LUCIUS, Director EIB
FROM LEFT TO RIGHT: Mr ANDRZEJ KRZEMINSKI President of the Management Board- EFL and Mr Mariusz KOLWAS, Vice-President of the Management Board - EFL
FROM LEFT TO RIGHT: Mr Andrzej KRZEMINSKI President of the Management Board- EFL Mrs Anita FÜRSTENBERG-LUCIUS, Director EIB Mr Anton ROP, Vice-President of the EIB
FROM LEFT TO RIGHT: Mr Andrzej KRZEMINSKI President of the Management Board- EFL Mrs Anita FÜRSTENBERG-LUCIUS, Director EIB, Mr Anton ROP, Vice-President of the EIB
FROM LEFT TO RIGHT: Mr Andrzej KRZEMINSKI President of the Management Board- EFL Mrs Anita FÜRSTENBERG-LUCIUS, Director EIB Mr Anton ROP, Vice-President of the EIB
FROM LEFT TO RIGHT: Mr Zygmunti TRYBKA, Director of the Financing Department EFL and Mr Piotr KOZIOL, Director of the Legal Department EFL
Group picture of the signature EFL Loan for SMEs and Mid-Caps III
from left to right:Mrs Flavia Palanza, Associate Director for Central and Eastern Africa, EIB, Mr. Jack Nkusi Kayonga, Chief Executive Officer of the Rwanda Development Bank and Mr Patrick Walsh, Director responsible for Africa, Caribbean and Pacific operations.
from left to right: Mr. Jack Nkusi KAYONGA, Chief Executive Officer of the Rwanda Development Bank and Mr Patrick Walsh, Director of the Central and Eastern Africa, Pacific Department of the EIB
Mr. Jack Nkusi KAYONGA, Chief Executive Officer of the Rwanda Development Bank
from left to right:Mrs Flavia Palanza, Associate Director for Central and Eastern Africa, EIB, Mr. Jack Nkusi Kayonga, Chief Executive Officer of the Rwanda Development Bank and Mr Patrick Walsh, Director responsible for Africa, Caribbean and Pacific operations.
from left to right:Mrs Flavia Palanza, Associate Director for Central and Eastern Africa, EIB, Mr. Jack Nkusi Kayonga, Chief Executive Officer of the Rwanda Development Bank and Mr Patrick Walsh, Director responsible for Africa, Caribbean and Pacific operations.
J.A.Mannai, Président du Fonds Monétaire Arabe; P.Maystadt, Président de la BEI; A.M.Ali Al-Madani, Président de la Banque Islamique de Développement; F.Baroin, Ministre de l'Economie, des Finances et de l'Industrie; D.Kaberuka, Président de la Banque Africaine de Développement; C.Lagarde, directrice générale du FMI
Photo de la signature
Photo de groupe de la signature
from left to right: Founders and biggest investors:
From left to right: all investors+Fund Manager:
Mr Anton Rop, Vice President of the European Investment Bank
de gauche à droite: M. Othman Ben Arfa, PDG de la STEG, M. Philippe de Fontaine Vive, Vice-président de la BEI et M. Mohamed Nouri Jouini, Ministre du Développement et de la Coopération Internationale
de gauche à droite: M. Othman Ben Arfa, PDG de la STEG et M. Philippe de Fontaine Vive, Vice-président de la BEI
de gauche à droite: M. Othman Ben Arfa, PDG de la Société Tunisienne de l'Electricité et du Gaz , M. Philippe de Fontaine Vive, Vice-président de la BEI et M. Mohamed Nouri Jouini, Ministre du Développement et de la Coopération Internationale
De gauche à droite:
Closing Ceremony Rural Impulse Fund II SA, SICAV-SIF; Luxembourg 1st June 2010
Closing
de gauche à droite: M.Carlos Da Silva Costa ,Vice Président de la BEI et M. Valls i Riera, Président de l'Autoridad Portuaria de Barcelona.
de gauche à droite: Carlos da Silva Costa, vice-président de la BEI et Ignacio Galán, Président d'Iberdrola
M. Philippe Maystadt, Président de la BEI, S.E.M. Premier Ministre de la Serbie et M. Dario Scannapieco, Vice-Président de la BEI à la signature de contrats
M. Philippe Maystadt, Président de la BEI et S.E.M. Mirko CVETKOVIC, Premier Ministre de la République de Serbie à la signature du livre d'or
Mr. I Dalianis, Financial Manager of Symetal ,Mr. K Kontos, General Manager of Symetal , Mr P Sakellaris Vice President of the EIB, Mr. D Kyriakopoulos, Executive Vice President of Elval and Mr. L Varouchas, General Manager of Elval
Mr P.Sakellaris, Vice President of the EIB and Mr D. Kyriakopoulos, Executive Vice President of Elval
Mr P. Sakellaris, Vice President of the EIB and Mr D.Kyriakopoulos, Executive Vice President of Elval
Press conference in Athens today, Mr Plutarchos Sakellaris, Vice President of the EIB
Press conference in Athens today, Mr Plutarchos Sakellaris, Vice President of the EIB
Press conference in Athens today, Mr Plutarchos Sakellaris, Vice President of the EIB
Press conference in Athens today, Mr Plutarchos Sakellaris, Vice President of the EIB
The Marseille Center for Mediterranean Integration is launched today
Le Centre de Marseille pour l’Intégration en Méditerranée est inauguré aujourd’hui
Photos
Session on "Modelling Cities and Urban Dynamics" hosted by the EIB-University Action Programme
Projects
Video library
All videos
Podcasts
Open learning
Contact

Tenke Fungurume Mining project, Democratic Republic of Congo (DRC)

    •  Display in:
    • de
    • en
    • fr
  • Available in: de en fr
  •  Date: 02 August 2007

The project

The Tenke Fungurume Mining project consists in the development of three consecutive open pit copper/cobalt ore mines, as well as in the construction and operation of an ore processing plant with a production capacity of 115,000 t/a of copper cathode and 8,000 t/a of cobalt metal. The Tenke Fungurume copper-cobalt deposits comprise one of the world's largest known copper-cobalt resources. The deposits are located within two concessions totaling over 1,500 square kilometers in the Katanga Province of the Democratic Republic of Congo (DRC).

The Tenke mining project is one of the first large private sector projects to be carried out in post-conflict Congo, and it is highly significant from an economic and developmental point of view. This project has been in preparation for over a decade, and the environmental and social issues have been subject to careful in-depth analysis. The promoter and financiers have carried out a very thorough due diligence, including extensive public consultations. The Environmental and Social Impact Assessment (ESIA) and other project documentation have been available to the public on the promoter's website for several months.

The DRC's interest

The DRC critically needs this investment and the fiscal revenues it will generate. Additionally, the Tenke project will help strengthen economic recovery and restore confidence with international investors. The project fosters economic growth, without which there can be no sustainable poverty reduction, through private sector development and the Bank's participation serves as a catalyst to attract foreign investment in a post-conflict country. The project is thus fully in line with the role of the EIB in the ACP countries under the Cotonou Agreement.

The project will valorise numerous indigenous natural resources (copper, cobalt, but also local generated power) and provide direct employment of some 1,100 people, supporting the livelihood of more than 5,000 people. During construction the project is likely to employ around 1,600 people, and at least two times as many indirect jobs will be created.

In addition, the promoter is setting up different initiatives - amongst those a community development fund - to improve the local education and health infrastructure and other social benefits, including improving the local transport service, refurbishing fresh water wells and new/rehabilitated schools to the local population.

The current review of the mining licenses by the Government of the DRC is being followed closely by the financiers of the project. High-level DRC government officials have already indicated that no fundamental problems are expected to arise with the Tenke project. This confirms the conclusions of a report published by the UN in 2003 on the investigation of illegal natural resources exploitation in the DRC. The UN report was generally rather critical, but the companies involved in this project were classified as "cleared, no further action required". Of course the Bank fully respects the work of the commission set up to carry out the review of the mining licenses and will take appropriate actions, if needed, in light of the commission's conclusions.

EIB's decision for the financing of the project

The EIB's Board of Directors has approved a loan of up to EUR 100 million for the Tenke project, subject to the following explicit conditions for disbursement:

  • All of the financing must be in place and no obstacles subsist to pari passu disbursement by any of the lenders.
  • The Bank will have received a non-objection letter from the DRC authorities (a standard requirement under Cotonou), which will not be issued before the review commission has conducted its work on Tenke.

Adequate monitoring will be put in place to ensure that the promoter performs and meets the obligations as foreseen in the contractual clauses.

Environmental and social issues

An independent Environmental and Social Impact Assessment (ESIA), compliant with EU Directive 97/11 as amended by Directive 2003/35, has been carried out. It has been written in a format to demonstrate conformity with the Equator Principles and IFC Performance Standards for both social and environmental issues. It includes detailed attention to biodiversity conservation, evidence of extensive public consultation, a comprehensive resettlement action plan as well as the frameworks for Environmental and Social Action, Reclamation and Closure, Occupational Health & Safety, and Emergency Response plans.

The project incorporates best industry practice and complies with the Bank's environmental statement and EU standards. An Independent Engineer has provided a comprehensive overview of the draft ESIA. The sponsors have employed experienced and competent professionals to handle physical environmental issues, biodiversity conservation and community outreach programmes. Work is being undertaken in accordance with prudent environmental management policies. Some details of the Action Plans will need to be further detailed as implementation proceeds but the existing frameworks provide competent bases for elaboration. A grievance redressal mechanism has been put in place.

Update 08 December 2008

The project has not yet been signed by the EIB, pending the satisfactory resolution of the mining review initiated by the Government in 2007. Disbursement of EIB funds will be subject to fulfilment of the conditions indicated above.

Update 26 March 2010

The EIB has been informed by the sponsors of the Tenke Fungurume project that the initial phase of the project has been completed. This initial phase was fully financed through sponsor's own funds and did not require debt finance from the EIB or other financial institutions. Until this notification, the EIB had remained committed to financing this initial phase of the Tenke project pending the satisfactory resolution of certain pre-conditions, including the mining contract review initiated by the DRC Government in June 2007. The EIB has informed the sponsors that it continues to have an interest in jointly exploring future areas of co-operation.


 Print
 Short Link